Full Name
Fuh Ying Hsi,Jerry
Variants
Jerry, F.Y.X.
Fuh, J.
Fuh, J.Y.H.
FUH, YING HSI JERRY
Fuh, Jerry Y.
Fuh, Jerry Y.H.
Fuh, Y.H.J.
Fuh, F.Y.H.
Fuh, Y.H.
Fuh, J.-Y.-H.
Fuh, Y.-H.J.
Fuh, J.Y.H
Hsi, J.Y.
FUH, YING HIS JERRY
FUH, JERRY YING
 
 
 
Email
mpefuhyh@nus.edu.sg
 

Results 1-20 of 240 (Search time: 0.103 seconds).

Issue DateTitleAuthor(s)
120093D CAD model search: A regularized manifold learning approachZhu, K.P. ; Wong, Y.S. ; Loh, H.T. ; Lu, W.F. ; Fuh, J.Y.H. 
210-Sep-2000A computer-aided EDM electrode design system for mold manufacturingDing, X.M.; Fuh, J.Y.H. ; Lee, K.S. ; Zhang, Y.F. ; Nee, A.Y.C. 
3Jan-2009A diffusion wavelet approach for 3-D model matchingZhu, K.P. ; Wong, Y.S. ; Lu, W.F. ; Fuh, J.Y.H. 
4Nov-1996A digraphic approach for dimensional chain identification in design and manufacturingJi, P.; Fuh, J.Y.H. ; Ahluwalia, R.S.
52007A fine granular concurrency control mechanism for a peer-to-peer cooperative design environmentLi, M.; Gao, S.; Fuh, J.Y.H. ; Zhang, Y. 
62010A genetic search algorithm for a vehicle routing problem with time windowsWang, Y.F.; Zhang, Y.F. ; Fuh, J.Y.H. 
7Dec-2001A hybrid method for recognition of undercut features from moulded partsYe, X.G. ; Fuh, J.Y.H. ; Lee, K.S. 
81-Jan-2012A hybrid particle swarm based method for process planning optimisationWang, Y.F.; Zhang, Y.F. ; Fuh, J.Y.H. 
92007A hybrid parting method based on iterative surface growth algorithm and geometric mouldabilityZhiqiang, Z.; Fuh, J.Y.H. ; Nee, A.Y.C. 
10Jun-2003A modified genetic algorithm for distributed scheduling problemsJia, H.Z. ; Nee, A.Y.C. ; Fuh, J.Y.H. ; Zhang, Y.F. 
112003A Multi-Agent-Based Agile Scheduling Model for a Virtual Manufacturing EnvironmentZhou, Z.D.; Wang, H.H.; Chen, Y.P.; Ai, W.; Ong, S.K. ; Fuh, J.Y.H. ; Nee, A.Y.C. 
121-Apr-1998A neural network approach for early cost estimation of packaging productsZhang, Y.F. ; Fuh, J.Y.H. 
131996A neural network approach to determining optimal inspection sampling size for CMMZhang, Y.F. ; Nee, A.Y.C. ; Fuh, J.Y.H. ; Neo, K.S. ; Loy, H.K.
142010A PSO-based multi-objective optimization approach to the integration of process planning and schedulingWang, Y.F.; Zhang, Y.F. ; Fuh, J.Y.H. 
15Nov-2006A Six-sigma approach for benchmarking of RP&M processesMahesh, M. ; Wong, Y.S. ; Fuh, J.Y.H. ; Loh, H.T. 
16Nov-2006A Six-sigma approach for benchmarking of RP&M processesMahesh, M. ; Wong, Y.S. ; Fuh, J.Y.H. ; Loh, H.T. 
17Jul-2001A volume decomposition approach to machining feature extraction of casting and forging componentsKailash, S.B.; Zhang, Y.F. ; Fuh, J.Y.H. 
18Aug-2003A volumetric difference-based adaptive slicing and deposition method for layered manufacturingYang, Y.; Fuh, J.Y.H. ; Loh, H.T. ; Wong, Y.S. 
192008A web-based assembly planning approachLu, C.; Wong, Y.S. ; Fuh, J.Y.H. 
202008A web-based integrated process planning and scheduling systemWang, Y.F.; Zhang, Y.F. ; Fuh, J.Y.H. ; Zhou, Z.D.; Xue, L.G.; Lou, P.