Please use this identifier to cite or link to this item: https://doi.org/10.1080/0305215X.2022.2085259
Title: A New Job Priority Rule for the NEH-based heuristic to Minimize Makespan in Permutation Flowshops
Authors: Jiang-Hua Zhang
Son Duy Dao
Wei Zhang
Mark Goh 
Guodong Yu
Yan Jin
Weibo Liu
Issue Date: 9-Jan-2023
Publisher: Taylor & Francis
Citation: Jiang-Hua Zhang, Son Duy Dao, Wei Zhang, Mark Goh, Guodong Yu, Yan Jin, Weibo Liu (2023-01-09). A New Job Priority Rule for the NEH-based heuristic to Minimize Makespan in Permutation Flowshops. Engineering Optimization 55 (8) : 1296-1315. ScholarBank@NUS Repository. https://doi.org/10.1080/0305215X.2022.2085259
Source Title: Engineering Optimization
URI: https://scholarbank.nus.edu.sg/handle/10635/243084
ISSN: 0305-215X
DOI: 10.1080/0305215X.2022.2085259
Appears in Collections:Staff Publications
Elements

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
10.10800305215X.2022.2085259.zip1.14 MBZIP

OPEN

NoneView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.