Please use this identifier to cite or link to this item: https://doi.org/10.1080/0305215X.2022.2085259
DC FieldValue
dc.titleA New Job Priority Rule for the NEH-based heuristic to Minimize Makespan in Permutation Flowshops
dc.contributor.authorJiang-Hua Zhang
dc.contributor.authorSon Duy Dao
dc.contributor.authorWei Zhang
dc.contributor.authorMark Goh
dc.contributor.authorGuodong Yu
dc.contributor.authorYan Jin
dc.contributor.authorWeibo Liu
dc.date.accessioned2023-07-14T06:38:52Z
dc.date.available2023-07-14T06:38:52Z
dc.date.issued2023-01-09
dc.identifier.citationJiang-Hua Zhang, Son Duy Dao, Wei Zhang, Mark Goh, Guodong Yu, Yan Jin, Weibo Liu (2023-01-09). A New Job Priority Rule for the NEH-based heuristic to Minimize Makespan in Permutation Flowshops. Engineering Optimization 55 (8) : 1296-1315. ScholarBank@NUS Repository. https://doi.org/10.1080/0305215X.2022.2085259
dc.identifier.issn0305-215X
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/243084
dc.publisherTaylor & Francis
dc.sourceTaylor & Francis
dc.typeArticle
dc.contributor.departmentANALYTICS AND OPERATIONS
dc.description.doi10.1080/0305215X.2022.2085259
dc.description.sourcetitleEngineering Optimization
dc.description.volume55
dc.description.issue8
dc.description.page1296-1315
Appears in Collections:Staff Publications
Elements

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
10.10800305215X.2022.2085259.zip1.14 MBZIP

OPEN

NoneView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.