Full Name
Xie Min
(not current staff)
Variants
Min, X.
Xie, M.
 
 
 
Email
isexiem@nus.edu.sg
 

Results 101-120 of 277 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
1011-Sep-2012Degradation-based burn-in with preventive maintenanceYe, Z.-S.; Shen, Y.; Xie, M. 
2Apr-1994Design and analysis of some fault-tolerance configurations based on a multipath principleZhuang, W.J. ; Xie, M. 
3Dec-2011Design and application of exponential chart for monitoring time-between-events data under random process shiftZhang, H.Y.; Shamsuzzaman, M.; Xie, M. ; Goh, T.N. 
4Dec-2006Design of exponential control charts using a sequential sampling schemeZhang, C.W.; Xie, M. ; Goh, T.N. 
52006Detection and correction process modeling considering the time dependencyWu, Y.P.; Hu, Q.P.; Xie, M. ; Ng, S.H. 
61993Development and applications of a three-parameter Weibull distribution with load-dependent location and scale parametersSun, Y.S.; Xie, M. ; Goh, T.N. ; Ong, H.L. 
7Dec-2004Distributed system availability in the case of imperfect debugging processXie, M. ; Dai, Y.S.; Poh, K.L. ; Lai, C.D.
82001Distribution of runs in a two-stage process monitoring modelLai, C.D.; Chan, L.Y.; Xie, M. 
92014Dynamic availability assessment and optimal component design of multi-state weighted k-out-of-n systemsFaghih-Roohi, S.; Xie, M. ; Ng, K.M. ; Yam, R.C.M.
10Dec-2005Dynamic programming for QFD optimizationLai, X.; Xie, M. ; Tan, K.C. 
112006Early software reliability prediction with ANN modelsHu, Q.P.; Xie, M. ; Ng, S.H. 
122006Early software reliability prediction with extended ANN modelHu, Q.P.; Dai, Y.S.; Xie, M. ; Ng, S.H. 
1321-Sep-2002Economic design of control chart for trended processesCai, D.Q.; Xie, M. ; Goh, T.N. ; Tang, X.Y.
14Jan-2008Economic design of cumulative count of conforming charts under inspection by samplesZhang, C.W.; Xie, M. ; Goh, T.N. 
152008Economic design of exponential chart for monitoring time-between-event data under random process shiftZhang, H.Y.; Xie, M. ; Goh, T.N. ; Shamsuzzaman, M. 
161-Dec-2005Economic design of exponential charts for time between events monitoringZhang, C.W.; Xie, M. ; Goh, T.N. 
172007Economic design of integrated time-between-events chart system with independent quality characteristicsZhang, H.Y.; Xie, M. ; Goh, T.N. ; Shamsuzzaman, M. 
18May-2011Economic design of time-between-events control chart systemZhang, H.Y.; Xie, M. ; Goh, T.N. ; Shamsuzzaman, M.
191998Effects of correlation on fraction non-conforming statistical process control proceduresLai, C.D.; Govindaraju, K.; Xie, M. 
20Jun-1994EM algorithms for estimating software reliability based on masked dataZhao, M.; Xie, M.