Full Name
Der-Horng Lee
Variants
Lee, D.-H
Lee, D.H.
Lee, D.-H.
Lee, Der Horng
Lee, Der-Horng
Lee, D.
Der-Horng Lee
 
 
 
Email
ceeleedh@nus.edu.sg
 

Refined By:
Type:  Article
Department:  CIVIL ENGINEERING

Results 21-40 of 40 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
21Nov-2004Logit-based stochastic user equilibrium problem for entry-exit toll schemesMeng, Q. ; Lee, D.-H. ; Cheu, R.L. ; Yang, H.
22May-2004Models and algorithms for the traffic assignment problem with link capacity constraintsNie, Y.; Zhang, H.M.; Lee, D.-H. 
232007Multiobjective model and solution method for integrated forward and reverse logistics network design for third-party logistics providersLee, D.-H. ; Bian, W.; Dong, M.
24Sep-2005Multiobjective vehicle routing and scheduling problem with time window constraints in hazardous material transportationMeng, Q. ; Lee, D.-H. ; Cheu, R.L. 
252007Multiproduct distribution network design of third-party logistics providers with reverse logistics operationsLee, D.-H. ; Bian, W.; Dong, M.
26Jul-2002New algorithm for a multiclass dynamic traffic assignment modelRan, B.; Lee, D.-H. ; Shin, M.S.-I.
27Jan-2010Origin-based partial linearization method for the stochastic user equilibrium traffic assignment problemLee, D.-H. ; Meng, Q. ; Deng, W.
28Mar-2010Performance of multiagent taxi dispatch on extended-runtime taxi availability: A simulation studySeow, K.T.; Lee, D.-H. 
29Jan-2002Probe vehicle population and sample size for arterial speed estimationLong Cheu, R. ; Xie, C.; Lee, D.-H. 
30Feb-2008Quay crane scheduling with handling priority in port container terminalsLee, D.-H. ; Wang, H.Q.; Miao, L.
31Jan-2008Quay crane scheduling with non-interference constraints in port container terminalsLee, D.-H. ; Wang, H.Q.; Miao, L.
32May-2004Scheduling of lane closures using genetic algorithms with traffic assignments and distributed simulationsMa, W.; Cheu, R.L. ; Lee, D.-H. 
33May-2007Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithmLee, D.-H ; Cao, Z.; Meng, Q. 
34Feb-2006Short-term freeway traffic flow prediction: Bayesian combined neural network approachZheng, W.; Lee, D.-H. ; Shi, Q.
35Apr-2006Simulation evaluation of the benefits of real-time traffic information to trucks during incidentsNg, S.T.; Cheu, R.L. ; Lee, D.-H. 
36Jul-2009Synchronization of yard truck scheduling and storage allocation in container terminalsLee, D.-H. ; Cao, J.X.; Shi, Q.X.
37Nov-2010The continuous Berth Allocation Problem: A Greedy Randomized Adaptive Search SolutionLee, D.-H. ; Chen, J.H.; Cao, J.X.
38May-2010The integrated yard truck and yard crane scheduling problem: Benders' decomposition-based methodsCao, J.X.; Lee, D.-H. ; Chen, J.H.; Shi, Q.
39Jul-2004Trial-and-error implementation of marginal-cost pricing on networks in the absence of demand functionsYang, H.; Meng, Q. ; Lee, D.-H. 
402002Uncoupled method for equilibrium-based linear path flow estimator for origin-destination trip matricesNie, Y.; Lee, D.-H.