Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Results 201-220 of 220 (Search time: 0.007 seconds).

Issue DateTitleAuthor(s)
201Mar-2007Spinning wave motion in frontal polymerizationInamdar, S.R.; Pujari, N.S.; Karimi, I.A. ; Ponrathnam, S.; Tayal, R.K.; Kulkarni, B.D.
2022009Strain improvement and process development for biobutanol productionKharkwal, S. ; Karimi, I.A. ; Chang, M.W.; Lee, D.-Y. 
20311-Jun-2021Study on boil-off gas (Bog) minimization and recovery strategies from actual baseload lng export terminal: Towards sustainable lng chainsBouabidi, Zineb; Almomani, Fares; Al-musleh, Easa, I; Katebah, Mary A.; Hussein, Mohamed M.; Shazed, Abdur Rahman; Karimi, Iftekhar A. ; Alfadala, Hassan
2042010Supply chain redesign and new process introduction in multipurpose plantsNaraharisetti, P.K.; Karimi, I.A. 
20522-Dec-2008Supply chain redesign through optimal asset management and capital budgetingNaraharisetti, P.K.; Karimi, I.A. ; Srinivasan, R. 
2062009Supply chain redesignsmultimodal optimization using a hybrid evolutionary algorithmNaraharisetti, P.K.; Karimi, I.A. ; Srinivasan, R. 
207Jun-2009Supply chain risk identification using a HAZOP-based approachAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
2082008Supply chain risk management through HAZOP and dynamic simulationAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
2092-Nov-2019Surrogate-based black-box optimisation via domain exploration and smart placementSUSHANT SUHAS GARUD ; Nivethitha Mariappan; KARIMI,IFTEKHAR ABUBAKAR 
2102011Surrogate-based VSA Process Optimization for Post-Combustion CO2 CaptureFaruque Hasan, M.M. ; Karimi, I.A. ; Farooq, S. ; Rajendran, A.; Amanullah, M.
2112012Synthesis Framework of Biorefinery Systems for Lignocellulosic BiorenewablesLi, W.; Karthik, R.; Karimi, I.A. ; Kwan, W.P.
212Apr-2010Synthesis of heat exchanger networks with nonisothermal phase changesFaruque Hasan, M.M. ; Jayaraman, G.; Karimi, I.A. ; Alfadala, H.E.
2132000Systematic procedure for reengineering process equipmentShastri, S.Srinivas ; Karimi, I.A. ; Rangaiah, G.P. ; Yap, Christopher 
14Apr-2011TOPS: Advanced decision support system for port and maritime chemical logisticsWu, X. ; Oh, H.C.; Karimi, I.A. ; Goh, M. ; De Souza, R.
152-Sep-2019Towards energy-efficient LNG terminals: Modeling and simulation of reciprocating compressorsReddy, HV ; Bisen, VS ; Rao, HN ; Dutta, A ; Garud, SS ; Karimi, IA ; Farooq, S 
1631-Jul-2019Two Stage Surrogate Assisted Framework For Box-Constrained Global OptimisationSUSHANT SUHAS GARUD ; Nivethitha Mariappan; KARIMI,IFTEKHAR ABUBAKAR 
1718-Jun-1999Two-parameter periodic solutions near a Hopf point in delay-differential equationsInamdar, S.R. ; Karimi, I. 
182009Unit slots based short-term scheduling for multipurpose batch plantsSusarla, N.; Li, J. ; Karimi, I.A. 
19May-2002Unlock supply chain improvements through effective logisticsKarimi, I.A. ; Srinivasan, R. ; Han, P.L.
202009Web-based applications for building, managing and analysing kinetic models of biological systemsLee, D.-Y. ; Saha, R.; Khan Yusufi, F.N.; Park, W.; Karimi, I.A.