Full Name
Kim Huat, David Chua
Variants
Chua, D.K.
Chua, D.
Chua, K.H.
Chua, D.K.H.
Chua David, K.H.
Chua, David K.H.
David, C.
 
 
 
Email
ceedavid@nus.edu.sg
 
 

Publications

Results 41-60 of 85 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
412003Improving Safety Risk Analysis Through The Application Of Case Based Reasoning ConceptsGoh Y.M. ; Chua D.K.H. 
22004Incident causation model for improving feedback of safety knowledgeChua, D.K.H. ; Goh, Y.M. 
31-Feb-2014Integrated prefabrication configuration and component grouping for resource optimization of precast productionKhalili, A.; Chua, D.K. 
4Jun-2005Interface management for China's build-operate-transfer projectsChan, W.T. ; Chen, C.; Messner, J.I.; Chua, D.K.H. 
52005Key constraint analysis: Achieve lean processes with the application of TOCSHEN LIJUN ; Chua, D.K.H. 
6Jul-2005Key constraints analysis with integrated production schedulerChua, D.K.H. ; SHEN LIJUN 
7Dec-1999Key determinants for construction schedule performanceKog, Y.C. ; Chua, D.K.H. ; Loh, P.K.; Jaselskis, E.J.
8Sep-2000Key factors in bid reasoning modelChua, D.K.H. ; Li, D.
92012Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and riskAttarzadeh, M.; Chua, D.K.H. ; Zhu, L. ; Beer, M.
30Jan-1994Mechanistic model for transition probabilitiesChua, K.H. ; Monismith, C.L.
11Sep-1997Model for construction budget performance - Neural network approachChua, D.K.H. ; Kog, Y.C. ; Loh, P.K.; Jaselskis, E.J.
122012Model for negotiation of refinancing gain from public-private partnershipZhu, L. ; Chua, D.K.H. 
13Oct-2001Modeling construction operations with RISimChua David, K.H. ; Li, G.M.
142006Modeling of functional construction requirements for constructability analysisSong, Y. ; Chua, D.K.H. 
152007Modelling the spatial temporal utilization of Construction Space Requirements using 4D CADChua, D.K.H. ; Yeoh, K.W.; Song, Y. 
1621-Mar-2003Moving element method for train-track dynamicsKoh, C.G. ; Ong, J.S.Y.; Chua, D.K.H. ; Feng, J. 
17May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
18Nov-1997Neural networks for construction project successChua, D.K.H. ; Loh, P.K.; Kog, Y.C. ; Jaselskis, E.J.
192012Optimizing concurrent execution of design activities with minimum redesignHossain, M.A.; Chua, D.K.H. ; Liu, Z. 
2029-Apr-2017Options-based negotiation management of PPP?BOT infrastructure projectsMeghdad Attarzadeh; David Chua ; Michael Beer; Ernest Abbott