Please use this identifier to cite or link to this item: https://doi.org/10.1155/2018/1347547
Title: In Situ Monitoring of the Long-Term Settlement of High-Fill Subgrade
Authors: Jia, L.
Guo, J.
Yao, K. 
Issue Date: 2018
Publisher: Hindawi Limited
Citation: Jia, L., Guo, J., Yao, K. (2018). In Situ Monitoring of the Long-Term Settlement of High-Fill Subgrade. Advances in Civil Engineering 2018 : 1347547. ScholarBank@NUS Repository. https://doi.org/10.1155/2018/1347547
Rights: Attribution 4.0 International
Abstract: Monitoring the settlement of high-fill subgrade plays a significant role in maintaining the service quality of highways. To investigate the postconstruction settlement of high-fill subgrade under gravity stress and vehicle loads, in situ monitoring was carried out on the Lanzhou-Yongjing highway. Single-point settlement meters were buried in various depths under the driveway and road shoulder. The evolution of settlement with time and space was analyzed. The results show that the settlement of the road shoulder is greater than that of the driveway; the settlement of the subgrade increases with time and tends to be stable after 1 year; the vehicle loads have no big effect on the settlement of the subgrade; the exponential model can be adopted to predict the settlement of the Lanzhou-Yongjing highway accurately. © 2018 Liang Jia et al.
Source Title: Advances in Civil Engineering
URI: https://scholarbank.nus.edu.sg/handle/10635/212566
ISSN: 1687-8086
DOI: 10.1155/2018/1347547
Rights: Attribution 4.0 International
Appears in Collections:Staff Publications
Elements

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
10_1155_2018_1347547.pdf3.9 MBAdobe PDF

OPEN

NoneView/Download

Google ScholarTM

Check

Altmetric


This item is licensed under a Creative Commons License Creative Commons