Please use this identifier to cite or link to this item: https://doi.org/10.1080/15623599.2019.1602807
Title: Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities ? a case study
Authors: Khaled Alhamouri
Carlos Caldas
Bon-Gang Hwang 
Pramesh Krishnankutty
Daniel P de Oliveira
Issue Date: 27-May-2019
Publisher: Taylor & Francis
Citation: Khaled Alhamouri, Carlos Caldas, Bon-Gang Hwang, Pramesh Krishnankutty, Daniel P de Oliveira (2019-05-27). Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities ? a case study. International Journal of Construction Management 21 (11) : 1115-1129. ScholarBank@NUS Repository. https://doi.org/10.1080/15623599.2019.1602807
Source Title: International Journal of Construction Management
URI: https://scholarbank.nus.edu.sg/handle/10635/208331
ISSN: 15623599
DOI: 10.1080/15623599.2019.1602807
Appears in Collections:Elements
Staff Publications

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
10.108015623599.2019.1602807.zip9.59 MBZIP

OPEN

NoneView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.