Title: On the calculus of risk in construction projects: Contradictory theories and a rationalized approach
Authors: Malekitabar, Hassan
Ardeshir, Abdollah
Sebt, Mohammad Hassan
Stouffs, Rudi 
Teo, Evelyn Ai Lin
Keywords: Science & Technology
Technology
Engineering, Industrial
Operations Research & Management Science
Engineering
Construction risk management
Risk scoring
Mathematical formulas
Multifaceted information
VAJONT
Issue Date: 1-Jan-2018
Publisher: ELSEVIER SCIENCE BV
Citation: Malekitabar, Hassan, Ardeshir, Abdollah, Sebt, Mohammad Hassan, Stouffs, Rudi, Teo, Evelyn Ai Lin (2018-01-01). On the calculus of risk in construction projects: Contradictory theories and a rationalized approach. SAFETY SCIENCE 101 : 72-85. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ssci.2017.08.014
Abstract: Evaluating risks through numbers-although an inevitable stage of risk management-can be seriously problematic, especially when marginalized groups of risks turn out to be significant, for example, to the lives of people. While it questions the effectiveness of the traditional approach to risk scoring, the literature provides no alternative satisfying all the criteria stressed by the critics. In fact, different dimensions of uncertainty, along which a risk can be viewed, entail different quantifications. Most previous work, however, concentrates on supposedly all-purpose solutions that are often justified or promoted over others by reasons not necessarily applicable; little information is available on how to best select the needed scoring approach. This research investigates the issues involved in constructing a risk factor formula that is more consistent with the nature of the project and its goals. Major concerns addressed in the literature are organized, serving as a basis to evaluate and improve seven groups of alternative formulas in light of mathematical arguments without which fallacious conclusions-such as the myth that importance is implied by exponents greater than one-would be inferred. These groups are complemented by a multifaceted approach introduced for the first time in this paper, providing the observer with customized information about risks. A robust scoring system founded on these results will ensure that allocated risk factors are neither too high nor too low. Although expressed in the terminology of construction safety, the findings of this research can be extended to other industries that feature some element of uncertainty.
Source Title: SAFETY SCIENCE
URI: https://scholarbank.nus.edu.sg/handle/10635/194364
ISSN: 09257535
18791042
DOI: 10.1016/j.ssci.2017.08.014
Appears in Collections:Staff Publications
Elements

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
1-s2.0-S0925753517314303-main.pdf1.68 MBAdobe PDF

CLOSED

Published
Risk Calculus 2018.pdf4.37 MBAdobe PDF

OPEN

Post-printView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.