Full Name
Ong Hoon Liong
(not current staff)
Variants
Ong, H.L.
Ong, Hoon Liong
 
 
 
Email
iseonghl@nus.edu.sg
 

Publications

Results 21-40 of 46 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
21Dec-2004Applying metaheuristics to feeder bus network design problemKuan, S.N.; Ong, H.L. ; Ng, K.M. 
221989Asymptotic expected performance of some TSP heuristics: An empirical evaluationOng, H.L. ; Huang, H.C. 
23Feb-2008Branch-and-bound algorithms for simple assembly line balancing problemLiu, S.B. ; Ng, K.M. ; Ong, H.L. 
241993Development and applications of a three-parameter Weibull distribution with load-dependent location and scale parametersSun, Y.S.; Xie, M. ; Goh, T.N. ; Ong, H.L. 
251984EXPECTED PERFORMANCE OF SOME LOT-SIZING HEURISTICS IN A ROLLING-SCHEDULE ENVIRONMENT.Huang, Huei Chuen ; Ong, Hoon Liong 
26Jun-2003Finding the exact volume of a polyhedronOng, H.L. ; Huang, H.C. ; Huin, W.M.
27Apr-2006Heuristic algorithms for visiting the customers in a rolling schedule environmentTeng, S.Y. ; Ong, H.L. ; Huang, H.C. 
28Jul-1992Interfuel substitution and decomposition of changes in industrial energy consumptionLiu, X.Q.; Ang, B.W. ; Ong, H.L. 
29Mar-2005Metaheuristics for minimizing the makespan of the dynamic shop scheduling problemLiu, S.Q.; Ong, H.L. ; Ng, K.M. 
30Mar-2005Metaheuristics for minimizing the makespan of the dynamic shop scheduling problemLiu, S.Q.; Ong, H.L. ; Ng, K.M. 
31Mar-2004Metaheuristics for the mixed shop scheduling problemLiu, S.Q.; Ong, H.L. 
32Mar-2004Metaheuristics for the mixed shop scheduling problemLiu, S.Q.; Ong, H.L. 
33May-2002Modeling the vehicle routine problem for a soft drink distribution companyCheong, Y.M.; Ong, H.L. ; Huang, H.C. 
34Oct-1986MODELLING OF CONVEYANCE CONSTRUCTION COST BY DECOMPOSITION TECHNIQUE.Ong, S.L. ; Ong, H.L. 
35Oct-1986MODELLING OF CONVEYANCE CONSTRUCTION COST BY DECOMPOSITION TECHNIQUE.Ong, S.L. ; Ong, H.L. 
36Nov-1985MODELLING STUDY OF MACHINE-SERVICE OPERATION IN AN ELECTRONICS INDUSTRY.Ong, H.L. ; Goh, T.N. ; Sim, H.K.
37Mar-1999Planning Accelerated Life Tests for Censored Two-Parameter Exponential DistributionsTang, L.C. ; Goh, T.N. ; Sun, Y.S.; Ong, H.L. 
381987Routing and scheduling of wardens for public car park inspectionOng, H.L. ; Goh, T.N. 
39Jul-1992Sector disaggregation and the effect of structural change on industrial energy consumptionAng, B.W. ; Liu, X.Q.; Ong, H.L. 
4016-Dec-2004Solving the biobjective zero-one knapsack problem by an efficient LP-based heuristicZhang, C.W.; Ong, H.L.