Full Name
Xie Min
(not current staff)
Variants
Min, X.
Xie, M.
 
 
 
Email
isexiem@nus.edu.sg
 

Results 201-220 of 363 (Search time: 0.008 seconds).

Issue DateTitleAuthor(s)
20110-Nov-2001On the monitoring of trended and regularly adjusted processesXie, M. ; Del Castillo, E.; Goh, T.N. ; Cai, D.Q.
202Oct-2002On the performance of geometric charts with estimated control limitsYang, Z.; Xie, M. ; Kuralmani, V. ; Tsui, K.-L.
203Oct-2002On the performance of geometric charts with estimated control limitsYang, Z.; Xie, M. ; Kuralmani, V. ; Tsui, K.-L.
204Jan-2011On the upper truncated Weibull distribution and its reliability implicationsZhang, T.; Xie, M. 
205Jan-2011On the upper truncated Weibull distribution and its reliability implicationsZhang, T.; Xie, M. 
206Mar-2004On variable sample size X̄ chart for processes with double assignable causesSim, S.B.; Kang, C.W.; Xie, M. 
2072006On weighted least squares estimation for parameters of the two-parameter weibull distributionZhang, L.F.; Xie, M. ; Tang, L.C.
208Jun-2004Optimal allocation of minimal and perfect repairs under resource constraintsCui, L.; Kuo, W.; Loh, H.T. ; Xie, M. 
209Jun-2004Optimal allocation of minimal and perfect repairs under resource constraintsCui, L.; Kuo, W.; Loh, H.T. ; Xie, M. 
2101-Feb-2013Optimal burn-in for repairable products sold with a two-dimensional warrantyYe, Z.-S.; Murthy, D.N.P.; Xie, M. ; Tang, L.-C. 
211Mar-2003Optimal control limits for CCC charts in the presence of inspection errorsRanjan, P.; Xie, M. ; Goh, T.N. 
212Mar-2003Optimal control limits for CCC charts in the presence of inspection errorsRanjan, P.; Xie, M. ; Goh, T.N. 
213Jan-2011Optimal defence of single object with imperfect false targetsPeng, R.; Levitin, G.; Xie, M. ; Ng, S.H. 
21415-May-2004Optimal number of hosts in a distributed system based on cost criteriaXie, M. ; Dai, Y.S.; Poh, K.L. ; Lai, C.D.
21515-May-2004Optimal number of hosts in a distributed system based on cost criteriaXie, M. ; Dai, Y.S.; Poh, K.L. ; Lai, C.D.
2165-Dec-2010Optimal redundant scheduling of grid tasks based on fault recoveryGuo, S.; Huang, H.; Xu, H.; Wan, H.; Xie, M. 
217Jan-2011Optimal software maintenance policy considering unavailable timeXiong, C.-J.; Xie, M. ; Ng, S.-H. 
2181-Oct-2010Optimal testing strategies in overlapped design processQian, Y.; Xie, M. ; Goh, T.N. ; Lin, J.
2191-Oct-2010Optimal testing strategies in overlapped design processQian, Y.; Xie, M. ; Goh, T.N. ; Lin, J.
22015-Apr-2003Optimal testing-resource allocation with genetic algorithm for modular software systemsDai, Y.S.; Xie, M. ; Poh, K.L. ; Yang, B.