Full Name
Bon-Gang Hwang
Variants
Hwang, B.G.
Hwang, Bon-Gang
Hwang, B.-G.
Hwang, B.
 
 
 
Email
bdghbg@nus.edu.sg
 

Publications

Refined By:
Date Issued:  [2010 TO 2019]
Policy:  Open

Results 1-9 of 9 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
12019Assessing the implementation of best productivity practices in maintenance activities, shutdowns, and turnarounds of petrochemical plantsKrishnankutty, P.; Hwang, B.-G. ; Caldas, C.H.; Muralidharan, S. ; de Oliveira, D.P.
22-Oct-2018Cost control in megaprojects: efficacy, tools and techniques, key knowledge areas and project comparisonsBon-Gang Hwang ; Ming Shan; Lei Zhu; Wai Cheng Lim
32-Oct-2018Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround ProjectsBon-Gang Hwang ; Pramesh Krishnankutty; Lei Zhu; Carlos Caldas; Arjun Shounak; Stephen P. Mulva
42019Investigating political risk paths in international high-speed railway projects: The case of Chinese international contractorsChang, T.; Deng, X.; Hwang, B.-G. 
520-Sep-2019Mechanization in building construction projects: assessment and views from the practitionersBon-Gang Hwang ; Ming Shan ; Jaime Ong; Pramesh Krishnankutty 
62019Prefabricated Prefinished Volumetric Construction: Key Constraints and Mitigation StrategiesLiu, W.Q.; Hwang, B.G. ; Shan, M.; Looi, K.Y.
713-Dec-2015RISK IDENTIFICATION AND ALLOCATION IN UNDERGROUND RAIL CONSTRUCTION JOINT VENTURES: CONTRACTORS’ PERSPECTIVEBon-Gang Hwang ; Xianbo Zhao; Gwendolyn Shiyun Yu
82019The impact of underground logistics system on urban sustainable development: A system dynamics approachDong, J.; Xu, Y.; Hwang, B. ; Ren, R.; Chen, Z.
927-May-2019Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities ? a case studyKhaled Alhamouri; Carlos Caldas; Bon-Gang Hwang ; Pramesh Krishnankutty; Daniel P de Oliveira