Please use this identifier to cite or link to this item:
https://doi.org/10.1080/15623599.2018.1492664
Title: | Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects | Authors: | Bon-Gang Hwang Pramesh Krishnankutty Lei Zhu Carlos Caldas Arjun Shounak Stephen P. Mulva |
Issue Date: | 2-Oct-2018 | Publisher: | Taylor & Francis | Citation: | Bon-Gang Hwang, Pramesh Krishnankutty, Lei Zhu, Carlos Caldas, Arjun Shounak, Stephen P. Mulva (2018-10-02). Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects. International Journal of Construction Management 20 (07) : 822-836. ScholarBank@NUS Repository. https://doi.org/10.1080/15623599.2018.1492664 | Source Title: | International Journal of Construction Management | URI: | https://scholarbank.nus.edu.sg/handle/10635/176319 | ISSN: | 1562-3599 | DOI: | 10.1080/15623599.2018.1492664 |
Appears in Collections: | Elements Staff Publications |
Show full item record
Files in This Item:
File | Description | Size | Format | Access Settings | Version | |
---|---|---|---|---|---|---|
10.108015623599.2018.1492664.docx | 2.99 MB | Microsoft Word XML | OPEN | None | View/Download |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.