Please use this identifier to cite or link to this item:
https://doi.org/10.1002/(SICI)1099-1638(199911/12)15:6<427::AID-QRE289>3.0.CO;2-T
Title: | Reliability in a time-driven product development process | Authors: | Lu, Y. Loh, H.T. Ibrahim, Y. Sander, P.C. Brombacher, A.C. |
Issue Date: | Nov-1999 | Citation: | Lu, Y., Loh, H.T., Ibrahim, Y., Sander, P.C., Brombacher, A.C. (1999-11). Reliability in a time-driven product development process. Quality and Reliability Engineering International 15 (6) : 427-430. ScholarBank@NUS Repository. https://doi.org/10.1002/(SICI)1099-1638(199911/12)15:6<427::AID-QRE289>3.0.CO;2-T | Abstract: | Fierce competition in the marketplace has led to industry giving a high priority to achieving time-to-market profitability. This results in an increasing pressure to introduce new products in a shorter time. At the same time, owing to new technological innovations, the complexity of the products increases as well. An additional pressure is that the customers also expect a high reliability of these complex and sometimes expensive products. This means that increasingly complex products have to be developed in a shorter time with higher levels of quality and reliability. In this paper we demonstrate by use of a case study how quality and reliability can be managed in a time-driven product development process (PDP). A general PDP is discussed first, then the case study is given, and finally it is discussed in general how high reliability can be combined with short time to market. | Source Title: | Quality and Reliability Engineering International | URI: | http://scholarbank.nus.edu.sg/handle/10635/58671 | ISSN: | 07488017 | DOI: | 10.1002/(SICI)1099-1638(199911/12)15:6<427::AID-QRE289>3.0.CO;2-T |
Appears in Collections: | Staff Publications |
Show full item record
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.