Please use this identifier to cite or link to this item: https://doi.org/10.1080/24725854.2020.1830207
Title: Faster or fewer iterations? A strategic perspective of a sequential product development project
Authors: Liu, Maoqi
Zheng, Li
LIU CHANGCHUN 
Keywords: Product development
Iteration
Lead time
Markov Process
Issue Date: 2-Oct-2020
Publisher: Informa UK Limited
Citation: Liu, Maoqi, Zheng, Li, LIU CHANGCHUN (2020-10-02). Faster or fewer iterations? A strategic perspective of a sequential product development project. IISE Transactions : 1-39. ScholarBank@NUS Repository. https://doi.org/10.1080/24725854.2020.1830207
Abstract: Shortening the lead time for product development (PD) provides enterprises with a competitive advantage. Given the iterative nature of PD projects, two aspects are regularly considered to shorten the PD lead time, that is, conducting faster or fewer iterations. However, executing faster iterations usually causes more iterations and vice versa. Therefore, suitable coordination between faster and fewer iterations is necessary to minimize the PD lead time. We investigate this coordination from a strategic perspective, whereby a PD project is considered as a sequence of stages and characterized by the design rates and rework probabilities of those stages. We model the coordination as a decision to choose the appropriate design rates for each stage, wherein the rework probabilities are negatively related to the design rates. An absorbing Markov process is applied to calculate the expected lead time of a PD project. Further, we formulate a geometric programming model to determine the optimal design rates of the stages with respect to the minimal expected lead time. Several insights are extracted from the model to provide general guidance on the coordination, including the effect of the acceptance check rate of the project, rework risk of the stages on the optimal design rates, and decomposability of the coordination. Inspired by these insights, an efficient heuristic algorithm is designed. The algorithm performs well in numerical experiments, which in turn validates the insights. Additionally, a field case proves the effectiveness of our model. Compared with the current policy, 12.25% of the PD lead time is saved through appropriate coordination between faster and fewer iterations.
Source Title: IISE Transactions
URI: https://scholarbank.nus.edu.sg/handle/10635/177020
ISSN: 2472-5854
2472-5862
DOI: 10.1080/24725854.2020.1830207
Appears in Collections:Staff Publications
Elements

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
interactapasample_Revised2.pdfAccepted version1.93 MBAdobe PDF

OPEN

Post-printView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.