Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/158826
Title: ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON
Authors: OH HONG CHOON
Issue Date: 2001
Citation: OH HONG CHOON (2001). ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON. ScholarBank@NUS Repository.
URI: https://scholarbank.nus.edu.sg/handle/10635/158826
Appears in Collections:Master's Theses (Restricted)

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
b22853509.PDF4.48 MBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.