Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/158826
DC FieldValue
dc.titleECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON
dc.contributor.authorOH HONG CHOON
dc.date.accessioned2019-09-16T02:39:47Z
dc.date.available2019-09-16T02:39:47Z
dc.date.issued2001
dc.identifier.citationOH HONG CHOON (2001). ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/158826
dc.sourceCCK BATCHLOAD 20190911
dc.typeThesis
dc.contributor.departmentCHEMICAL & ENVIRONMENTAL ENGINEERING
dc.contributor.supervisorKARIMI IFTEKHAR A.
dc.description.degreeMaster's
dc.description.degreeconferredMASTER OF ENGINEERING
Appears in Collections:Master's Theses (Restricted)

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
b22853509.PDF4.48 MBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.