Please use this identifier to cite or link to this item:
https://doi.org/10.1080/21681015.2019.1646508
Title: | Minimizing the maximum flow time for flexible job shop problem with parallel machines | Authors: | Xiang, Nengjie LIU CHANGCHUN |
Issue Date: | 14-Aug-2019 | Publisher: | Informa UK Limited | Citation: | Xiang, Nengjie, LIU CHANGCHUN (2019-08-14). Minimizing the maximum flow time for flexible job shop problem with parallel machines. Journal of Industrial and Production Engineering : 1-15. ScholarBank@NUS Repository. https://doi.org/10.1080/21681015.2019.1646508 | Source Title: | Journal of Industrial and Production Engineering | URI: | https://scholarbank.nus.edu.sg/handle/10635/158046 | ISSN: | 2168-1015 2168-1023 |
DOI: | 10.1080/21681015.2019.1646508 |
Appears in Collections: | Staff Publications Elements |
Show full item record
Files in This Item:
File | Description | Size | Format | Access Settings | Version | |
---|---|---|---|---|---|---|
2-7 Minimizing the maximum flow time for flexible job shop problem with parallel machines.pdf | 1.85 MB | Adobe PDF | CLOSED | Published |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.