Please use this identifier to cite or link to this item: https://doi.org/10.1504/EJIE.2018.090622
Title: Minimising tardiness in hybrid two-stage batch scheduling problem in cyber-physical systems
Authors: Liu, Changchun 
Wang, Qiang
Xiang, Xi
Zheng, Li
Keywords: Science & Technology
Technology
Engineering, Industrial
Operations Research & Management Science
Engineering
cyber-physical systems
CPSs
tardiness
dynamic programming
variable neighbourhood search algorithm
WIRELESS SENSOR NETWORKS
TIME DISTRIBUTED SYSTEMS
DATA AGGREGATION
PROCESSING TIMES
SETUP TIMES
ONE MACHINE
NP-HARD
ASSIGNMENT
ALGORITHM
TRANSPORTATION
Issue Date: 1-Jan-2018
Publisher: INDERSCIENCE ENTERPRISES LTD
Citation: Liu, Changchun, Wang, Qiang, Xiang, Xi, Zheng, Li (2018-01-01). Minimising tardiness in hybrid two-stage batch scheduling problem in cyber-physical systems. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING 12 (2) : 276-306. ScholarBank@NUS Repository. https://doi.org/10.1504/EJIE.2018.090622
Abstract: The real time characteristic is a critical property of cyber-physical systems and the transmission tardiness introduced by the computer system can lead to a significant performance degradation. In order to improve the real-time performance, data aggregation is always employed during data transmission. This paper studies a hybrid two-stage batch scheduling problem in which a set of receiving sensors are assigned to collect the data at the first stage and an aggregation sensor is employed to receive the data from receiving sensors, fuse and transmit the data to the destination at the second stage. Two objectives, which are minimising the number of tardy tasks and the total transmission tardiness, are studied. Some analytical properties are proved and some algorithms are proposed to solve the problem. Extensive numerical experiments are conducted to test the performances of the proposed algorithms. [Received 27 July 2017; Revised 28 November 2017; Accepted 2 January 2018]
Source Title: EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
URI: https://scholarbank.nus.edu.sg/handle/10635/155204
ISSN: 1751-5254
1751-5262
DOI: 10.1504/EJIE.2018.090622
Appears in Collections:Staff Publications
Elements

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
1-9 Minimising tardiness in hybrid two-stage batch.pdfPublished version744.85 kBAdobe PDF

OPEN

NoneView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.