Full Name
Xie Min
(not current staff)
Variants
Min, X.
Xie, M.
 
 
 
Email
isexiem@nus.edu.sg
 

Refined By:
Date Issued:  [2000 TO 2009]
Subject:  Reliability

Results 1-12 of 12 (Search time: 0.006 seconds).

Issue DateTitleAuthor(s)
1Oct-2005A general Weibull model for reliability analysis under different failure criteria - Application on anisotropic conductive adhesive joining technologyLiu, J.; Cao, L.; Xie, M. ; Goh, T.-N. ; Tang, Y.
22005A reliability model for piezoelectric actuatorsHe, Z.; Loh, H.T. ; Xie, M. ; Guo, X.
3Feb-2007A two-dimensional probability model for evaluating reliability of piezoelectric micro-actuatorsHe, Z.; Loh, H.T. ; Xie, M. 
4Jan-2007A unified confidence interval for reliability-related quantities of two-parameter Weibull distributionYang, Z.; Xie, M. ; Wong, A.C.M.
52008Availability modeling and cost optimization for the grid resource management systemDai, Y.-S.; Xie, M. ; Poh, K.-L. 
62000Exponential approximation for maintained Weibull distributed componentXie, M. ; Kong, H.; Goh, T.N. 
72008On a framework for Strategic and Tactical Risk ManagementChengwei, L.; Min, X. ; Habibullah, M.S.
81-Jun-2006On the dual reliability systems of ( n, f, k ) and 〈 n, f, k 〉Cui, L.; Kuo, W.; Li, J.; Xie, M. 
91-Jun-2006On the dual reliability systems of ( n, f, k ) and 〈 n, f, k 〉Cui, L.; Kuo, W.; Li, J.; Xie, M. 
102000Optimum prioritisation and resource allocation based on fault tree analysisXie, M. ; Tan, K.C. ; Goh, K.H.; Huang, X.R.
1116-May-2004Sequential inspection strategy for multiple systems under availability requirementCui, L.R. ; Loh, H.T. ; Xie, M. 
1216-May-2004Sequential inspection strategy for multiple systems under availability requirementCui, L.R. ; Loh, H.T. ; Xie, M.