Full Name
Xie Min
(not current staff)
Variants
Min, X.
Xie, M.
 
 
 
Email
isexiem@nus.edu.sg
 

Refined By:
Date Issued:  [2000 TO 2009]
Author:  Goh, T.-N.

Results 1-20 of 70 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
12008A bayesian inference approach for probabilistic analogy based software maintenance effort estimationLi, Y.F.; Xie, M. ; Goh, T.N. 
211-Apr-2002A comparative study of neural network and Box-Jenkins ARIMA modeling in time series predictionHo, S.L.; Xie, M. ; Goh, T.N. 
3Dec-2002A conditional decision procedure for high yield processesKuralmani, V.; Xie, M. ; Goh, T.N. ; Gan, F.F. 
4Dec-2007A control chart for the Gamma distribution as a model of time between eventsZhang, C.W.; Xie, M. ; Liu, J.Y.; Goh, T.N. 
5Oct-2005A general Weibull model for reliability analysis under different failure criteria - Application on anisotropic conductive adhesive joining technologyLiu, J.; Cao, L.; Xie, M. ; Goh, T.-N. ; Tang, Y.
62004A general Weibull model for reliability analysis under different failure criteria -application on anisotropic conductive adhesive joining technologyLiu, J.; Cao, L.; Xie, M. ; Goh, T.-N. ; Tang, Y.
7Dec-2007A methodology to improve higher education quality using the quality function deployment and analytic hierarchy processRaharjo, H.; Xie, M. ; Goh, T.N. ; Brombacher, A.C. 
82009A MEWMA chart for a bivariate exponential distributionXie, Y.J.; Xie, M. ; Goh, T.N. 
92009A model of open source software maintenance activitiesXiong, C.J.; Li, Y.F.; Xie, M. ; Ng, S.H. ; Goh, T.N. 
10Jun-2002A modified Weibull extension with bathtub-shaped failure rate functionXie, M. ; Tang, Y.; Goh, T.N. 
112008A study of analogy based sampling for interval based cost estimation for software project managementLi, Y.F.; Xie, M. ; Goh, T.N. 
12Feb-2007A study of EWMA chart with transformed exponential dataLiu, J.Y.; Xie, M. ; Goh, T.N. ; Chan, L.Y.
132007A study of genetic algorithm for project selection for analogy based software cost estimationLi, Y.F.; Xie, M. ; Goh, T.N. 
14May-2001A study of lifetime distributions for regularly replaced systemsKong, H.; Xie, M. ; Goh, T.N. 
15Apr-2009A study of mutual information based feature selection for case based reasoning in software cost estimationLi, Y.F.; Xie, M. ; Goh, T.N. 
16Feb-2009A study of project selection and feature weighting for analogy based software cost estimationLi, Y.F.; Xie, M. ; Goh, T.N. 
17Oct-2003A Study of the Connectionist Models for Software Reliability PredictionHo, S.L.; Xie, M. ; Goh, T.N. 
18Dec-2009A study of the non-linear adjustment for analogy based software cost estimationLi, Y.F.; Xie, M. ; Goh, T.N. 
1916-Oct-2003A two-stage decision procedure for monitoring processes with low fraction nonconformingChan, L.Y.; Lai, C.D.; Xie, M. ; Goh, T.N. 
202006Adopting Six Sigma in higher education: Some issues and challengesHo, S.L.; Xie, M. ; Goh, T.N.