Full Name
Fwa Tien Fang
Variants
Tien-Frang, Fwa
Fwa, Tien F.
Fwa, T.F
Tien-Fang Fwa
Fwa, T.
FWA, TIEN FANG
Fwa, Tien Fang
Fwa, F.T.
Fwa, Tien-Fang
Fwa, T.F.
Fwa, T.-F.
 
 
 
Email
ceefwatf@nus.edu.sg
 
Other emails
 

Refined By:
Date Issued:  [2010 TO 2019]
Department:  CIVIL & ENVIRONMENTAL ENGINEERING

Results 1-19 of 19 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
112-Jan-2013Airport pavement missing data management and imputation with stochastic multiple imputation modelFarhan, J.; Fwa, T. 
21-Dec-2011Computation of aircraft braking distancesPasindu, H.R.; Fwa, T.F. ; Ong, G.P. 
318-Apr-2012Critical rut depth for pavement maintenance based on vehicle skidding and hydroplaning considerationFwa, T.F. ; Pasindu, H.R.; Ong, G.P. 
42013Evaluating the influence of aggregate size on permeability of porous pavements using finite volume simulationZhang, L.; Ong, G.P. ; Fwa, T.F. 
52013Evaluating wet weather driving benefits of grooved pavementsJu, F.; Fwa, T.F. ; Ong, G.P. 
62013Evaluation of effects of priority preferences on optimal resource allocation in pavement managementFarhan, J.; Fwa, T.F. 
72013Finite-element analysis of effect of wide-base tire on tire-pavement noiseYang, J.S.; Fwa, T.F. ; Ong, G.P. ; Chew, C.H. 
82013High-strength high-porosity pervious concrete pavementLim, E.; Tan, K.H. ; Fwa, T.F. 
92013High-strength high-porosity pervious concrete pavementLim, E.; Tan, K.H. ; Fwa, T.F. 
108-Jun-2012Incorporating Priority Preferences into Pavement Maintenance ProgrammingFarhan, J.; Fwa, T.F. 
118-Jun-2012Incorporating Priority Preferences into Pavement Maintenance ProgrammingFarhan, J.; Fwa, T.F. 
122014Influences of pore size on the permeability and skid resistance of porous pavementZhang, L.; Ong, G.P. ; Fwa, T.F. 
13Oct-2012Optimal multiasset maintenance budget allocation in highway asset managementFwa, T.F. ; Farhan, J.
14Oct-2012Optimal multiasset maintenance budget allocation in highway asset managementFwa, T.F. ; Farhan, J.
151-Dec-2011Use of analytic hierarchy process to prioritize network-level maintenance of pavement segments with multiple distressesFarhan, J.; Fwa, T.F. 
161-Dec-2011Use of analytic hierarchy process to prioritize network-level maintenance of pavement segments with multiple distressesFarhan, J.; Fwa, T.F. 
172013Use of high percentage of recycled concrete aggregate in aircraft stand rigid pavementHo, N.Y.; Lee, Y.P.K.; Fwa, T.F. ; Tan, J.Y.; Lim, W.F.; Teoh, E.S.; Tan, S.; Chew, W.S.
182013Use of high percentage of recycled concrete aggregate in aircraft stand rigid pavementHo, N.Y.; Lee, Y.P.K.; Fwa, T.F. ; Tan, J.Y.; Lim, W.F.; Teoh, E.S.; Tan, S.; Chew, W.S.
192014Vehicle headway distribution in work zonesWeng, J.; Meng, Q.; Fwa, T.F.