Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Refined By:
Subject:  Optimization

Results 1-18 of 18 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
1Jul-2011A linear diversity constraint - Application to scheduling in microgridsNaraharisetti, P.K. ; Karimi, I.A. ; Anand, A. ; Lee, D.-Y. 
2May-2007A model-based rescheduling framework for managing abnormal supply chain eventsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
32005An online decision support framework for managing abnormal supply chain eventsBansal, M. ; Adhitya, A.; Srinivasan, R. ; Karimi, I.A. 
4Dec-2013Cycle synthesis and optimization of a VSA process for postcombustion CO2 captureHaghpanah, R.; Nilam, R.; Rajendran, A.; Farooq, S. ; Karimi, I.A. 
524-Nov-2008Decision support for integrated refinery supply chains. Part 2. Design and operationKoo, L.Y.; Adhitya, A.; Srinivasan, R. ; Karimi, I.A. 
624-Feb-2014Efficient algorithm for simultaneous synthesis of heat exchanger networksHuang, K.F.; Karimi, I.A. 
72012Heat Exchanger Network Synthesis Using a Hyperstructure of Stagewise Stream SuperstructuresHuang, K.F.; Karimi, I.A. 
87-May-2012Heat exchanger network synthesis using a stagewise superstructure with non-isothermal mixingHuang, K.F.; Al-mutairi, E.M.; Karimi, I.A. 
9Feb-2007Heuristic rescheduling of crude oil operations to manage abnormal supply chain eventsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
102009Optimal LNG contract selection using mixed integer linear programmingKhalilpour, R.; Karimi, I.A. 
112009Optimal LNG contract selection using mixed integer linear programmingKhalilpour, R.; Karimi, I.A. 
122009Optimization of compressor networks in LNG operationsFaruque Hasan, M.M. ; Razib, Md.S.; Karimi, I.A. 
132012Optimizing the PSA process of propylene/propane using Neuro-Fuzzy modelingKhalighi, M.; Farooq, S. ; Karimi, I.A. 
142008Routing and scheduling of parcel tankers: A novel solution approachOh, H.-C.; Karimi, I.A. 
152008Routing and scheduling of parcel tankers: A novel solution approachOh, H.-C.; Karimi, I.A. 
1619-Jul-2013Simultaneous synthesis approaches for cost-effective heat exchanger networksHuang, K.F.; Karimi, I.A. 
1719-Jul-2013Simultaneous synthesis approaches for cost-effective heat exchanger networksHuang, K.F.; Karimi, I.A. 
182011Surrogate-based VSA Process Optimization for Post-Combustion CO2 CaptureFaruque Hasan, M.M. ; Karimi, I.A. ; Farooq, S. ; Rajendran, A.; Amanullah, M.