Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Refined By:
Date Issued:  2004

Results 1-20 of 26 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
12004A comparison of continuous-time models for scheduling noncontinuous plantsSivanandam, S.P.; Balla, G.; Sundaramoorthy, A.; Karimi, I.A. 
22004A continuous-time formulation for scheduling multi-stage multi-product batch plants with identical parallel unitsYu, L.; Karimi, I.A. 
32004A heuristic reactive scheduling strategy for recovering from refinery supply chain disruptionsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
4Mar-2004A new continuous-time formulation for scheduling crude oil operationsReddy, P.C.P.; Karimi, I.A. ; Srinivasan, R. 
515-Dec-2004An improved formulation for scheduling an automated wet-etch stationKarimi, I.A. ; Tan, Z.Y.L.; Bhushan, S.
62004An improved formulation for scheduling multipurpose batch plants using synchronous slotsKarimi, I.A. ; Sundaramoorthy, A.
72004Assessing and accelerating new product introductions in a pharmaceutical plantKarimi, I.A. ; Sundaramoorthy, A.
82004Branching analysis of T-periodic solutions in nonlinear biochemical systems using reductive perturbation methodBabu, B.M.; Inamdar, S.R.; Karimi, I.A. ; Kulkarni, B.D.
92004Facilitating new product introductions in pharmaceutical plants via optimized planning and outsourcingKarimi, I.A. ; Sundaramoorthy, A.
102004Facilitating new product introductions in pharmaceutical plants via optimized planning and outsourcingKarimi, I.A. ; Sundaramoorthy, A.
112004Facilitating new product introductions in pharmaceutical plants via optimized planning and outsourcingKarimi, I.A. ; Sundaramoorthy, A.
1215-Mar-2004Heuristic algorithms for scheduling an automated wet-etch stationBhushan, S.; Karimi, I.A. 
1315-Jul-2004Improving the logistics of multi-compartment chemical tankersJetlund, A.S.; Karimi, I.A. 
142004Modeling and scheduling stepper operations in the photolithography process in wafer fabricationGanesh, B.; Karimi, I.A. 
152004Modeling and scheduling stepper operations in the photolithography process in wafer fabricationGanesh, B.; Karimi, I.A. 
16Jun-2004Novel solution approach for optimizing crude oil operationsReddy, P.C.P.; Karimi, I.A. ; Srinivasan, R. 
17Jun-2004Novel solution approach for optimizing crude oil operationsReddy, P.C.P.; Karimi, I.A. ; Srinivasan, R. 
1822-Dec-2004Planning in pharmaceutical supply chains with outsourcing and new product introductionsSundaramoorthy, A.; Karimi, I.A. 
1922-Dec-2004Planning in pharmaceutical supply chains with outsourcing and new product introductionsSundaramoorthy, A.; Karimi, I.A. 
20Feb-2004Prediction of Binary Gas Diffusion in Carbon Molecular Sieves at High PressureQinglin, H.; Farooq, S. ; Karimi, I.A.