Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Publications

Results 1-20 of 147 (Search time: 0.007 seconds).

Issue DateTitleAuthor(s)
12012A Comparison Study of Adjoint-Based Gradient Search Technique and Mathematical Programming for Optimal Well-PlacementToh, R.Y.; Tavallali, M.S.; Leow, W.X.; Karimi, I.A. 
22005A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel unitsLiu, Y.; Karimi, I.A. 
32014A genome-scale metabolic model of Methanococcus maripaludis S2 for CO 2 capture and conversion to methaneGoyal, N.; Widiastuti, H.; Karimi, I.A. ; Zhou, Z.
4Jul-2011A linear diversity constraint - Application to scheduling in microgridsNaraharisetti, P.K. ; Karimi, I.A. ; Anand, A. ; Lee, D.-Y. 
5May-2007A model-based rescheduling framework for managing abnormal supply chain eventsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
62006A multi-agent approach to supply chain management in the chemical industrySrinivasan, R. ; Bansal, M. ; Karimi, I.A. 
7Mar-2004A new continuous-time formulation for scheduling crude oil operationsReddy, P.C.P.; Karimi, I.A. ; Srinivasan, R. 
8Jul-2010A novel approach to scheduling multipurpose batch plants using unit-slotsSusarla, N.; Li, J. ; Karimi, I.A. 
9Jul-2007A novel CDU model for refinery planningLi, W.; Hui, C.-W.; Karimi, I.A. ; Srinivasan, R. 
102012A Novel Multi-Grid Formulation for Scheduling Semi-Continuous PlantsSusarla, N.; Li, J.; Karimi, I.A. 
1114-Dec-2011A sharp cut algorithm for optimizationInamdar, S.R.; Karimi, I.A. ; Parulekar, S.J.; Kulkarni, B.D.
12May-2005A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plantsSundaramoorthy, A.; Karimi, I.A. 
1330-Apr-2003A slot-based formulation for single-stage multiproduct batch plants with multiple orders per productLim, M.-F.; Karimi, I.A. 
142011A taxonomy and review of the multiple criteria decision-making literature in chemical engineeringPirdashti, M.; Tavana, M.; Hassim, M.H.; Behzadian, M.; Karimi, I.A. 
152002Agent-based refinery supply chain managementJulka, N.; Karimi, I. ; Srinivasan, R. 
1615-Dec-2002Agent-based supply chain management - 1: FrameworkJulka, N.; Srinivasan, R. ; Karimi, I. 
1715-Dec-2002Agent-based supply chain management - 2: A refinery applicationJulka, N.; Karimi, I. ; Srinivasan, R. 
1820-Jan-2010An analysis of some unit-specific event-based models for the short-term scheduling of noncontinuous processesLi, J. ; Susarla, N.; Karimi, I.A. ; Shaik, M.A.; Floudas, C.A.
192003An improved MILP formulation for scheduling an automated wet-etch stationKarimi, I.A. ; Tan, Z.Y.L.; Bhushan, S.
202006An integrated model for planning in global chemical supply chainsSundaramoorthy, A.; Xianming, S.; Karimi, I.A. ; Srinivasan, R.