Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Results 181-200 of 220 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
1815-Apr-2008Scheduling multistage batch plants with parallel units and no interstage storageLiu, Y.; Karimi, I.A. 
182Mar-2007Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storageLiu, Y.; Karimi, I.A. 
18320-Feb-2002Scheduling parallel production lines with resource constraints. 1. Model formulationLamba, N.; Karimi, I.A. 
18420-Feb-2002Scheduling parallel production lines with resource constraints. 2. Decomposition algorithmLamba, N.; Karimi, I.A. 
185Jan-2005Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M.; Mahalingam, H. 
62004Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M. ; Mahalingam, H.
72004Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M.; Mahalingam, H. 
822-Nov-2006Scheduling tanker-lightering operations in crude oil transportationHuang, C.; Karimi, I.A. 
915-Mar-2006Scheduling trans-shipment operations in maritime chemical transportationHuang, C.; Karimi, I.A. 
107-Sep-2011Selection of liquefied natural gas (LNG) contracts for minimizing procurement costKhalilpour, R.; Karimi, I.A. 
112008Selection of third-party service contracts for chemical logisticsBansal, M. ; Karimi, I.A. ; Srinivasan, R. 
125-Nov-2008Selection of third-party service contracts for chemical logisticsBansal, M. ; Karimi, I.A. ; Srinivasan, R. 
132008Short-term scheduling of multipurpose batch processes using unit slotsSusarla, N.; Li, J. ; Karimi, I. 
142003Short-term scheduling of refinery operations from unloading crudes to distillationChandra Prakash Reddy, P.; Karimi, I.A. ; Srinivasan, R. 
15Aug-2020Simulation and health monitoring of a pressure regulating stationLeo, Matthew Bryan ; Dutta, Arnab ; Farooq, Shamsuzzaman ; Karimi, Iftekhar A 
162019Simulation of a combined cycle gas turbine power plant in Aspen HYSYSLiu, Z. ; Karimi, I.A. 
172012Simultaneous Optimal Placement of Injector and Producer Wells Using Mathematical ProgrammingLeow, W.X.; Tavallali, M.S.; Karimi, I.A. ; Teo, K.M. 
1819-Jul-2013Simultaneous synthesis approaches for cost-effective heat exchanger networksHuang, K.F.; Karimi, I.A. 
192005Sourcing-production-distribution planning of global multi-product chemical manufacturing processes with duty drawbackOh, H.-C. ; Karimi, I.A. 
202005Sourcing-production-distribution planning of global multi-product chemical manufacturing processes with duty drawbackOh, H.-C. ; Karimi, I.A.