Full Name
Kim Huat, David Chua
Variants
Chua, D.K.
Chua, D.
Chua, K.H.
Chua, D.K.H.
Chua David, K.H.
Chua, David K.H.
David, C.
 
 
 
Email
ceedavid@nus.edu.sg
 
 

Publications

Results 21-40 of 85 (Search time: 0.007 seconds).

Issue DateTitleAuthor(s)
21Jan-1998Collaborative scheduling over the internetChan, W.-T. ; Chua, D.K.H. ; Lang, X.
22003Component State Criteria Representation to Incorporate Construction Program Knowledge for Constructability AnalysisChua, D.K.H. ; Song, Y. 
32001Component state model and its application in constructablity analysis of construction schedulesChua, D.K.H. ; Song, Y. 
4May-2003Constraint-based planning with integrated production scheduler over internetChua, D.K.H. ; Shen, L.J. ; Bok, S.H. 
5Jun-1996Construction resource scheduling with genetic algorithmsChan, W.-T. ; Chua, D.K.H. ; Kannan, G.
6May-1999Critical success factors for different project objectivesChua, D.K.H. ; Kog, Y.C.; Loh, P.K.
72000Decision support for contract strategyLoh, P.K.; Chua, D.K.H. ; Kog, Y.C.; Henningsen, M.
28Nov-2005Detection of spatio-temporal conflicts on a temporal 3D space systemSong, Y. ; Chua, D.K.H. 
918-Apr-2023Dynamic behavior of asphalt concrete substructure ballastless track system in long-span railway bridgeGang Liu; Zhendong Qian; Diyun Yang; Leilei Chen; David Kim Huat Chua ; Zhigang Li
101993Dynamic decision model for pavement management using mechanistic pavement performance submodelChua, K.H. ; Monismith, C.L.; Crandall, K.C.
112016Empiric piperacillin-tazobactam versus carbapenems in the treatment of bacteraemia due to extended-spectrum beta-lactamase-producing enterobacteriaceaeNg T.M.; Khong W.X.; Harris P.N.A.; De P.P.; Chow A.; Tambyah P.A. ; Lye D.C. 
122014Formalizing Construction Safety Knowledge for Intelligent BIM-Based Review of Design for Safety.Qui, N., ; Abbott, E. L. S. ; Chua, D. K. H. ; Goh Y.M. 
132011Framework for an IFC-based tool for implementing design for deconstruction (DfD)Khalili, A.; Chua, D.K.H. 
14Jan-1996Framework for PMS using mechanistic distress submodelsChua, D.K.H. 
15May-1992Groundborne vibrations due to trains in tunnelsChua, K.H. ; Balendra, T. ; Lo, K.W. 
161-May-2002Identification of Factors Causing Fatal Construction Accidents.Goh Y.M. ; Chua D.K.H. 
172018Identifying critical bankability criteria for PPP projects: The case of ChinaZhu, L.; Chua, D.K.H. 
181-May-2013IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabricationKhalili, A.; Chua, D.K.H. 
192005Impact of variability on construction schedulesSHEN LIJUN ; Chua, D.K.H. 
20Mar-2003Impacts of obstacles in East Asian cross-border constructionChua, D.K.H. ; Wang, Y.; Tan, W.T.