Full Name
Goh Thong Ngee
(not current staff)
Variants
Goh T.N.
Ngee, G.T.
Goh, T.N.
Gohc, T.N.
Xie M., He B.
Goh, T.-N.
Goh, Thongngee
 
 
 
Email
isegohtn@nus.edu.sg
 

Publications

Results 101-120 of 159 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
101Jun-2004On changing points of mean residual life and failure rate function for some generalized Weibull distributionsXie, M. ; Goh, T.N. ; Tang, Y.
230-Jun-2001On economic design of cumulative count of conforming chartXie, M. ; Tang, X.Y.; Goh, T.N. 
3Jun-2010On integrating Kano's model dynamics into QFD for multiple product designRaharjo, H.; Brombacher, A.C.; Gohc, T.N. ; Bergmana, B.
4Mar-2000On optimal setting of control limits for geometric chartXie, M. ; Goh, T.N. ; Kuralmani, V. 
5Jun-2003On the estimation error in zero-inflated poisson model for process controlHe, B.; Xie, M. ; Goh, T.N. ; Ranjan, P.
610-Nov-2001On the monitoring of trended and regularly adjusted processesXie, M. ; Del Castillo, E.; Goh, T.N. ; Cai, D.Q.
72000Operating frameworks for statistical quality engineeringGoh, T.N. 
8Mar-2003Optimal control limits for CCC charts in the presence of inspection errorsRanjan, P.; Xie, M. ; Goh, T.N. 
91-Oct-2010Optimal testing strategies in overlapped design processQian, Y.; Xie, M. ; Goh, T.N. ; Lin, J.
102008Optimization of feature weights and number of neighbors for analogy based cost estimation in software project managementLi, Y.F.; Xie, M. ; Goh, T.N. 
11Apr-2003Orthogonal arrays for experiments with lean designsChan, L.-Y.; Ma, C.-X.; Goh, T.N. 
12Feb-2011Outlier identification and robust parameter estimation in a zero-inflated Poisson modelYang, J.; Xie, M. ; Goh, T.N. 
131992Performance optimization: a phased approachGoh, T.N. 
141999Perspectives on statistical quality engineeringGoh, T.N. 
15Mar-1999Planning Accelerated Life Tests for Censored Two-Parameter Exponential DistributionsTang, L.C. ; Goh, T.N. ; Sun, Y.S.; Ong, H.L. 
16Jan-1996Planning environmental stress-screening based on DOD-HDBK-344 - A case studyMok, Y.L.; Xie, M. ; Goh, T.N. 
171995Positive management orientation for continuous improvementYeo, C.H. ; Goh, T.N. ; Xie, M. 
181995Prioritizing processes for better implementation of statistical process control techniquesXie, M. ; Goh, T.N. ; Xie, W.
191998Prioritizing processes in initial implementation of statistical process controlGoh, T.N. ; Xie, M. ; Xie, W.
202010Problem-based learning approach to application of statistical experimentationGoh, T.N. ; Lam, S.W.