CHEMICAL AND BIOMOLECULAR ENGINEERING

Organization name
CHEMICAL AND BIOMOLECULAR ENGINEERING


Results 701-720 of 3203 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
7015-Nov-2008Selection of third-party service contracts for chemical logisticsBansal, M. ; Karimi, I.A. ; Srinivasan, R. 
7027-Sep-2011Selection of liquefied natural gas (LNG) contracts for minimizing procurement costKhalilpour, R.; Karimi, I.A. 
63May-2004Selection of inherently safer process routes: A case studyPalaniappan, C.; Srinivasan, R. ; Tan, R. 
64May-2011Selected papers from PSE ASIA 2010Rangaiah, G.P. ; Kariwala, V.; Chiu, M.-S. 
65Jul-2006Seeding and constant-supersaturation control by ATR-FTIR in anti-solvent crystallizationYu, Z.Q.; Chow, P.S.; Tan, R.B.H. 
66Jun-1998Secondary ionic forces in lead molybdate melt solidificationZeng, H.C. ; Lim, L.C. 
672009Secondary flow behavior in a double bifurcationLeong, F.Y.; Smith, K.A.; Wang, C.-H. 
682005Secondary flow behavior and particle transport in bifurcationsLeong, F.Y.; Smith, K.A.; Wang, C.-H. 
6914-Aug-2008Screening for cocrystallization tendency: The role of intermolecular interactionsHe, G.; Jacob, C.; Guo, L.; Chow, P.S.; Tan, R.B.H. 
701-Jan-2004SCR of lean NOx with C3H8 over Co/MFI catalysts: Dependence on synthesis condition of MFI and Co locationChen, X.-Y.; Shen, S.-C. ; Chen, H.-H. ; Kawi, S. 
7115-Mar-2006Scheduling trans-shipment operations in maritime chemical transportationHuang, C.; Karimi, I.A. 
7222-Nov-2006Scheduling tanker-lightering operations in crude oil transportationHuang, C.; Karimi, I.A. 
73Jan-2005Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M.; Mahalingam, H. 
742004Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M. ; Mahalingam, H.
752004Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M.; Mahalingam, H. 
7620-Feb-2002Scheduling parallel production lines with resource constraints. 2. Decomposition algorithmLamba, N.; Karimi, I.A. 
7720-Feb-2002Scheduling parallel production lines with resource constraints. 1. Model formulationLamba, N.; Karimi, I.A. 
78Mar-2007Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storageLiu, Y.; Karimi, I.A. 
795-Apr-2008Scheduling multistage batch plants with parallel units and no interstage storageLiu, Y.; Karimi, I.A. 
803-Aug-2011Scheduling gasoline blending operations from recipe determination to shipping using unit slotsLi, J. ; Karimi, I.A.