Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Refined By:
Subject:  Scheduling
Date Issued:  [2000 TO 2009]

Results 1-20 of 24 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
12004A comparison of continuous-time models for scheduling noncontinuous plantsSivanandam, S.P.; Balla, G.; Sundaramoorthy, A.; Karimi, I.A. 
22009A multi-grid scheduling model for integrated gasoline blending operationsLi, J. ; Karimi, I.A. 
3May-2005A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plantsSundaramoorthy, A.; Karimi, I.A. 
415-Dec-2004An improved formulation for scheduling an automated wet-etch stationKarimi, I.A. ; Tan, Z.Y.L.; Bhushan, S.
52004An improved formulation for scheduling multipurpose batch plants using synchronous slotsKarimi, I.A. ; Sundaramoorthy, A.
6Oct-2007Improving the robustness and efficiency of crude scheduling algorithmsLi, J. ; Li, W. ; Karimi, I.A. ; Srinivasan, R. 
72004Modeling and scheduling stepper operations in the photolithography process in wafer fabricationGanesh, B.; Karimi, I.A. 
82004Modeling and scheduling stepper operations in the photolithography process in wafer fabricationGanesh, B.; Karimi, I.A. 
9Dec-2007Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel unitsLiu, Y.; Karimi, I.A. 
10Dec-2007Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel unitsLiu, Y.; Karimi, I.A. 
11Jun-2004Novel solution approach for optimizing crude oil operationsReddy, P.C.P.; Karimi, I.A. ; Srinivasan, R. 
12Jun-2004Novel solution approach for optimizing crude oil operationsReddy, P.C.P.; Karimi, I.A. ; Srinivasan, R. 
132005Optimal scheduling of tanker lightering operationsHuang, C.; Karimi, I.A. 
142005Optimal scheduling of tanker lightering operationsHuang, C.; Karimi, I.A. 
1515-Aug-2001Planning production on a single processor with sequence-dependent setups. Part 2: Campaign sequencing and schedulingOh, H.-C. ; Karimi, I.A. 
1615-Aug-2001Planning production on a single processor with sequence-dependent setups. Part 2: Campaign sequencing and schedulingOh, H.-C. ; Karimi, I.A. 
172005Scheduling chemical transshipment operations in maritime transportationHuang, C.; Karimi, I.A. 
182005Scheduling chemical transshipment operations in maritime transportationHuang, C.; Karimi, I.A. 
195-Apr-2008Scheduling multistage batch plants with parallel units and no interstage storageLiu, Y.; Karimi, I.A. 
205-Apr-2008Scheduling multistage batch plants with parallel units and no interstage storageLiu, Y.; Karimi, I.A.