Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Refined By:
Department:  COLLEGE OF DESIGN AND ENGINEERING
Type:  Conference Paper

Results 1-20 of 77 (Search time: 0.007 seconds).

Issue DateTitleAuthor(s)
12004A comparison of continuous-time models for scheduling noncontinuous plantsSivanandam, S.P.; Balla, G.; Sundaramoorthy, A.; Karimi, I.A. 
22004A continuous-time formulation for scheduling multi-stage multi-product batch plants with identical parallel unitsYu, L.; Karimi, I.A. 
32005A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slotsSundaramoorthy, A.; Karimi, I.A. ; Yu, L.; Srinivasan, R. 
42004A heuristic reactive scheduling strategy for recovering from refinery supply chain disruptionsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
52005A holistic approach for portfolio selection and resource-constrained scheduling of multi-task projectsViswanathan, P.K.; Karimi, I.A. ; Sundaramoorthy, A.
62005A model-based disruption management strategy for distributed supply chainsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
72009A multi-grid scheduling model for integrated gasoline blending operationsLi, J. ; Karimi, I.A. 
82008A novel continuous-time formulation for short-term scheduling of continuous processesLi, J. ; Susarla, N.; Karimi, I.A. 
92005A novel framework and tool for dynamic simulation of supply chainsSivanandam, S.P.; Srinivasan, R. ; Karimi, I.A. 
102012A pilot plant study of a VSA process for CO2 capture from power plant flue gasRao, V.R.; Krishnamurthy, S.; Guntuka, S.K.; Rajendran, A.; Ullah, M.A.; Sharratt, P.; Karimi, I.A. ; Farooq, S. 
1115-Dec-2004An improved formulation for scheduling an automated wet-etch stationKarimi, I.A. ; Tan, Z.Y.L.; Bhushan, S.
122004An improved formulation for scheduling multipurpose batch plants using synchronous slotsKarimi, I.A. ; Sundaramoorthy, A.
132005Application of multi-objective simulation-optimization techniques to inventory management problemsLee, L.H. ; Teng, S. ; Chew, E.P. ; Karimi, I.A. ; Lye, K.W.; Lendermann, P.; Choon, Y.C.; Koh, H.
142004Assessing and accelerating new product introductions in a pharmaceutical plantKarimi, I.A. ; Sundaramoorthy, A.
152007Asset management in and redesign of chemical supply chainsNaraharisetti, P.K.; Karimi, I.A. ; Srinivasan, R.; Wang, D.
162004Branching analysis of T-periodic solutions in nonlinear biochemical systems using reductive perturbation methodBabu, B.M.; Inamdar, S.R.; Karimi, I.A. ; Kulkarni, B.D.
172009Chemical logistics - Going beyond intra-plant excellenceKarimi, I.A. 
182008Combined statistical and genome-scale analysis of mammalian cell lines producing bio-therapeuticsSelvarasu, S.; Lee, D.-Y. ; Karimi, I.A. 
191-Sep-2019Comparison of Methods for Granger Causality Network EstimationVenugopal, A ; Dutta, A ; Samavedham, L ; Karimi, IA 
202009Crude oil transshipment using floating, storage, and offloading platforms (FSOPs)Bairam, S.; Karimi, I.A.