Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/74440
Title: A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
Authors: Sundaramoorthy, A.
Karimi, I.A. 
Yu, L.
Srinivasan, R. 
Issue Date: 2005
Citation: Sundaramoorthy, A.,Karimi, I.A.,Yu, L.,Srinivasan, R. (2005). A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots. AIChE Annual Meeting, Conference Proceedings : 7550-7554. ScholarBank@NUS Repository.
Abstract: Short-term scheduling of multipurpose batch plants is a challenging problem for which several formulations exist in the literature. In these plants, there are many kinds of resource constraints which often lead these problems even tougher. Based on the work of Sundaramoorthy & Karimi (2005), we extend the mixed integer linear programming (MILP) formulation to the problems with different kinds of resource constraints. Due to the same continuous-time representation with synchronous slots with the original formulation, our extended formulation with fewer binary variables, constraints, and nonzeros seems to have good efficiency for these tough problems. Finally, several examples will be illustrated to demonstrate the superiority of our model.
Source Title: AIChE Annual Meeting, Conference Proceedings
URI: http://scholarbank.nus.edu.sg/handle/10635/74440
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.