Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/72399
Title: Scheduling MEMS manufacturing
Authors: Lixin, Wang
Hock, Francis Tay Eng 
Hay, Lee Loo 
Issue Date: 2000
Citation: Lixin, Wang,Hock, Francis Tay Eng,Hay, Lee Loo (2000). Scheduling MEMS manufacturing. Winter Simulation Conference Proceedings 2 : 1472-1480. ScholarBank@NUS Repository.
Abstract: This paper focuses on the production scheduling in MEMS (Micro-Electro Mechanical System) manufacturing. The whole MEMS production process can be organized into 3 sub-processes, i.e., the wafer front-end process, the wafer cap process and the back-end process. Every wafer processed by the wafer front-end process needs to be bonded with a wafer that is manufactured in the wafer cap process, and then it will be sent to the back-end process. Therefore how to synchronize the release of wafers into the front-end process as well as the wafer cap process becomes an important topic. An ineffective coordination will create long cycle time and large WIP (work-in-process). In this paper, four synchronization rules are developed and they are evaluated together with two release rules and five dispatching rules. The performance measures considered are cycle time, throughput rate and WIP. A visual interactive simulation model is constructed to imitate the production line. The simulation results indicate that synchronization rules, release rules, and dispatching rules, have significant impacts on the performance of MEMS manufacturing and the best policy combination is Littlesyn-CONWIP-SRPT.
Source Title: Winter Simulation Conference Proceedings
URI: http://scholarbank.nus.edu.sg/handle/10635/72399
ISSN: 02750708
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.