Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/66424
DC FieldValue
dc.titleA slot-based formulation for single-stage multiproduct batch plants with multiple orders per product
dc.contributor.authorLim, M.-F.
dc.contributor.authorKarimi, I.A.
dc.date.accessioned2014-06-17T08:30:14Z
dc.date.available2014-06-17T08:30:14Z
dc.date.issued2003-04-30
dc.identifier.citationLim, M.-F.,Karimi, I.A. (2003-04-30). A slot-based formulation for single-stage multiproduct batch plants with multiple orders per product. Industrial and Engineering Chemistry Research 42 (9) : 1914-1924. ScholarBank@NUS Repository.
dc.identifier.issn08885885
dc.identifier.urihttp://scholarbank.nus.edu.sg/handle/10635/66424
dc.description.abstractMultiple orders per product with different due dates are natural in multiproduct batch plants. Existing approaches for scheduling short-term operations in such plants invariably treat each order as if it were a distinct product, convert orders into batches first, and then schedule batches using predecessor - successor variables. A novel mixed-integer linear programming (MILP) model that deals explicitly with multiple orders per product decides both product batches and their schedule in one formulation and uses slots is presented for single-stage batch plants with parallel, nonidentical units. The model is compared thoroughly with existing ones using four illustrative examples. As shown in an example, our model gives better and faster solutions than the current two-step approach. Both our general model and the one reduced for the special case of a single order per product consistently outperform other models by using fewer variables and constraints and by reducing nodes, iterations, and solution times by substantial factors. This paper shows that MILP models with big-M constraints suffer from an erratic dependence on M. Such models cannot be compared based on just one value of M and surely not based on different values of M, a fact overlooked in the literature so far. In contrast to other models, our model is relatively more robust with respect to M and is even free of M for the makespan objective. Last, slotbased models may be superior alternatives to predecessor - successor models for the present problem.
dc.sourceScopus
dc.typeArticle
dc.contributor.departmentCHEMICAL & ENVIRONMENTAL ENGINEERING
dc.description.sourcetitleIndustrial and Engineering Chemistry Research
dc.description.volume42
dc.description.issue9
dc.description.page1914-1924
dc.description.codenIECRE
dc.identifier.isiutNOT_IN_WOS
Appears in Collections:Staff Publications

Show simple item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.