Please use this identifier to cite or link to this item:
https://doi.org/10.1016/j.jclepro.2003.12.022
DC Field | Value | |
---|---|---|
dc.title | An LCA study of a primary aluminum supply chain | |
dc.contributor.author | Tan, R.B.H. | |
dc.contributor.author | Khoo, H.H. | |
dc.date.accessioned | 2014-06-17T07:35:55Z | |
dc.date.available | 2014-06-17T07:35:55Z | |
dc.date.issued | 2005-05 | |
dc.identifier.citation | Tan, R.B.H., Khoo, H.H. (2005-05). An LCA study of a primary aluminum supply chain. Journal of Cleaner Production 13 (6) : 607-618. ScholarBank@NUS Repository. https://doi.org/10.1016/j.jclepro.2003.12.022 | |
dc.identifier.issn | 09596526 | |
dc.identifier.uri | http://scholarbank.nus.edu.sg/handle/10635/63475 | |
dc.description.abstract | The production of aluminum billets - starting from the conversion of bauxite to alumina, the processing of alumina to aluminum, and the final cast product - is studied using a Life Cycle Assessment (LCA) approach. The aluminum supply chain consists of a refinery, a smelter, and a casting plant. In the LCA model, the environmental loads of four different case scenarios were investigated. The scenarios included various approaches employed for improving the environmental performance of the system for the production of 1 ton of aluminum metal. The final impact assessment results for the overall environmental loads of the supply chain showed cumulative decreases of 2.2% and 3.8% for Scenarios 2 and 3, respectively. In Scenario 2, scrap metal was reduced from the casting plant. For Scenario 3, the reduction of scrap metal from casting was accompanied by improvements of both energy efficiency and reject rates at the smelter. A significant cumulative decrease of 32.8% was obtained in Scenario 4, which was mainly due to the reduction of red mud from the refinery by about 50%. © 2004 Elsevier Ltd. All rights reserved. | |
dc.description.uri | http://libproxy1.nus.edu.sg/login?url=http://dx.doi.org/10.1016/j.jclepro.2003.12.022 | |
dc.source | Scopus | |
dc.subject | Life Cycle Assessment | |
dc.subject | Primary aluminum production | |
dc.subject | Supply chain | |
dc.type | Article | |
dc.contributor.department | CHEMICAL & BIOMOLECULAR ENGINEERING | |
dc.description.doi | 10.1016/j.jclepro.2003.12.022 | |
dc.description.sourcetitle | Journal of Cleaner Production | |
dc.description.volume | 13 | |
dc.description.issue | 6 | |
dc.description.page | 607-618 | |
dc.description.coden | JCROE | |
dc.identifier.isiut | 000227108900006 | |
Appears in Collections: | Staff Publications |
Show simple item record
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.