Please use this identifier to cite or link to this item:
https://doi.org/10.1080/00207540701579522
Title: | A WIP control policy for tandem lines | Authors: | Subramaniam, V. Rongling, Y. Ruifeng, C. Prakash Singh, S. |
Keywords: | Inventory management Manufacturing systems Production control Transfer lines |
Issue Date: | Jan-2009 | Citation: | Subramaniam, V., Rongling, Y., Ruifeng, C., Prakash Singh, S. (2009-01). A WIP control policy for tandem lines. International Journal of Production Research 47 (4) : 1127-1149. ScholarBank@NUS Repository. https://doi.org/10.1080/00207540701579522 | Abstract: | The control of manufacturing systems has many similarities with the management of inventories in warehouses. Based on the detailed analysis of these similarities, a new control policy is proposed in this paper. Simulation studies demonstrate that this new policy performs better than several established control policies by providing a higher service level with a lower work in process (WIP). This policy is in its infant stage of development and only single part type tandem lines (transfer lines) are studied in this paper. Studies of re-entrant production systems or multiple part type systems are the focus of future research. | Source Title: | International Journal of Production Research | URI: | http://scholarbank.nus.edu.sg/handle/10635/59347 | ISSN: | 00207543 | DOI: | 10.1080/00207540701579522 |
Appears in Collections: | Staff Publications |
Show full item record
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.