Please use this identifier to cite or link to this item:
https://scholarbank.nus.edu.sg/handle/10635/46503
Title: | The measurement of just in time wastage for a public housing project in Singapore: This case study shows that Neo's accounting procedure is workable in practice where the productivity and time wastage of each task is identified at various stages | Authors: | Pheng, L.S. Tan, S.K.L. |
Keywords: | Just in time data Singapore Social housing case study |
Issue Date: | 1997 | Citation: | Pheng, L.S.,Tan, S.K.L. (1997). The measurement of just in time wastage for a public housing project in Singapore: This case study shows that Neo's accounting procedure is workable in practice where the productivity and time wastage of each task is identified at various stages. Building Research and Information 25 (2) : X-79. ScholarBank@NUS Repository. | Abstract: | Just in time waste data is useful for a number of reasons; these include the ability to streamline operations, the ability to be more responsive to the environment, and the improvement in productivity, quality assurance, scheduling and cost savings. | Source Title: | Building Research and Information | URI: | http://scholarbank.nus.edu.sg/handle/10635/46503 | ISSN: | 09613218 |
Appears in Collections: | Staff Publications |
Show full item record
Files in This Item:
There are no files associated with this item.
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.