Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/153874
Title: Ambuklao Hydroelectric Power Plant Clean Development Mechanism Project
Authors: XU, SONG
Keywords: CDM
Kyoto Protocol
CER
ACM0002
Hydro power plants
repowering
Issue Date: 2007
Citation: XU, SONG (2007). Ambuklao Hydroelectric Power Plant Clean Development Mechanism Project. ScholarBank@NUS Repository.
Abstract: The work is for Ambuklao Hydroelectric Power Plant CDM project, where CDM is a flexible mechanism under Kyoto Protocol to reduce Greenhouse Gases. This dissertation establishes the mathematical and financial models for the project. The mathematical model is set up according to ACM0002, ‘Consolidated baseline methodology for grid-connected electricity generation from renewable sources’, a methodology approved by UN. Both Operational Margin Emission Factor and Build Margin Emission Factor are crucial to computing Emission Reductions. The data used to estimate the emission factors is collected from published resources. For a 76.5 MW capacity power plant, repowering will generate ex-ante 148,758 tCO2e/year. Financial model is established, including both NPV-IRR analysis and sensitivity analysis (or scenario analysis). Various CDM related financial information have been collected according to both published resources and market observations. Unfortunately, due to the property of the work done, much financial information is not allowed to be further disclosed.
URI: https://scholarbank.nus.edu.sg/handle/10635/153874
Appears in Collections:Master's Theses (Restricted)

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Xu, Song_Xu Song_Dissertation.pdf323.92 kBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.