Title: TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
Authors: LOW CHIN HWA @ LOW YIK HONG
Issue Date: 2002
Citation: LOW CHIN HWA @ LOW YIK HONG (2002). TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION. ScholarBank@NUS Repository.
Abstract: The size and population density of Singapore's urban areas has created an increasing demand for cost-effective underground construction. This demand has created new opportunities for new method of underground construction to minimise construction cost and impacts on the public. During the construction of the North East Line (NEL), the semi top down construction method is first introduced in Singapore. The NEL consist of sixteen underground stations linked by bored and cut and cover tunnels. Two of the underground stations adopted the semi top down method construction while the other fourteen stations adopted the conventional bottom up construction method. This research is conducted to determine the feasibility of adopting semi top down construction method from the perspective of project cost and time. Ultimately, it was found that semi top down construction was not cost efficient and time saving as compared to the conventional bottom up construction method.
URI: https://scholarbank.nus.edu.sg/handle/10635/151567
Appears in Collections:Master's Theses (Restricted)

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
TimLow.pdf9.04 MBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.