Please use this identifier to cite or link to this item: https://doi.org/10.1155/2013/280560
DC FieldValue
dc.titleA three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates
dc.contributor.authorZhang R.
dc.date.accessioned2018-08-17T03:34:39Z
dc.date.available2018-08-17T03:34:39Z
dc.date.issued2013
dc.identifier.citationZhang R. (2013). A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates. Discrete Dynamics in Nature and Society 2013. ScholarBank@NUS Repository. https://doi.org/10.1155/2013/280560
dc.identifier.issn10260226
dc.identifier.urihttp://scholarbank.nus.edu.sg/handle/10635/145834
dc.publisherHindawi Publishing Corporation
dc.sourceScopus
dc.typeArticle
dc.contributor.departmentELECTRICAL AND COMPUTER ENGINEERING
dc.description.doi10.1155/2013/280560
dc.description.sourcetitleDiscrete Dynamics in Nature and Society
dc.description.volume2013
dc.published.statepublished
Appears in Collections:Staff Publications
Elements

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
280560.pdf2.36 MBAdobe PDF

OPEN

NoneView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.