Please use this identifier to cite or link to this item:
https://doi.org/10.1007/s12205-014-0045-x
DC Field | Value | |
---|---|---|
dc.title | Construction project risk management in Singapore: Resources, effectiveness, impact, and understanding | |
dc.contributor.author | Zhao, X. | |
dc.contributor.author | Hwang, B.-G. | |
dc.contributor.author | Phng, W. | |
dc.date.accessioned | 2014-12-01T08:23:24Z | |
dc.date.available | 2014-12-01T08:23:24Z | |
dc.date.issued | 2014-01 | |
dc.identifier.citation | Zhao, X., Hwang, B.-G., Phng, W. (2014-01). Construction project risk management in Singapore: Resources, effectiveness, impact, and understanding. KSCE Journal of Civil Engineering 18 (1) : 27-36. ScholarBank@NUS Repository. https://doi.org/10.1007/s12205-014-0045-x | |
dc.identifier.issn | 12267988 | |
dc.identifier.uri | http://scholarbank.nus.edu.sg/handle/10635/113985 | |
dc.description.abstract | While previous studies have focused on the need for Project Risk Management (PRM), highlighting its potential benefits, resources invested in PRM have been rarely identified. This study aims to investigate the resource allocation, effectiveness, impact and understanding of construction PRM in Singapore. To achieve the objectives, a questionnaire survey was conducted with professionals and 43 complete questionnaires were returned. The results revealed that higher proportion of costs was invested in PRM than time and labor resources, and that more resources invested would not necessarily lead to a higher level of PRM effectiveness and greater assurance with the achievement of project objectives. Also, the results showed the low-level understanding of PRM in the survey firms and suggested that the overall impact of PRM on project outcomes differed according to levels of understanding. Despite the low-level understanding, all the nine PRM principles and guidelines were significantly agreed. Hence, this study provides a clear picture of PRM in the Singapore construction industry. The findings of this study can help practitioners to better implement PRM and assure the achievement of project outcomes. © 2014 Korean Society of Civil Engineers and Springer-Verlag Berlin Heidelberg. | |
dc.description.uri | http://libproxy1.nus.edu.sg/login?url=http://dx.doi.org/10.1007/s12205-014-0045-x | |
dc.source | Scopus | |
dc.subject | construction industry | |
dc.subject | effectiveness | |
dc.subject | impact | |
dc.subject | project risk management | |
dc.subject | resource | |
dc.subject | singapore | |
dc.type | Article | |
dc.contributor.department | BUILDING | |
dc.description.doi | 10.1007/s12205-014-0045-x | |
dc.description.sourcetitle | KSCE Journal of Civil Engineering | |
dc.description.volume | 18 | |
dc.description.issue | 1 | |
dc.description.page | 27-36 | |
dc.identifier.isiut | 000329104300004 | |
Appears in Collections: | Staff Publications |
Show simple item record
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.