Publications

Refined By:
Department:  COLLEGE OF DESIGN AND ENGINEERING
Department:  CIVIL AND ENVIRONMENTAL ENGINEERING
Author:  Weng, J.

Results 1-20 of 25 (Search time: 0.006 seconds).

Issue DateTitleAuthor(s)
1Oct-2011A Genetic algorithm approach to assessing work zone casualty riskMeng, Q. ; Weng, J.
2Nov-2010A probabilistic quantitative risk assessment model for the long-term work zone crashesMeng, Q. ; Weng, J.; Qu, X. 
3Dec-2011An improved cellular automata model for heterogeneous work zone trafficMeng, Q. ; Weng, J.
4Sep-2011Analysis of driver casualty risk for different work zone typesWeng, J.; Meng, Q. 
51-Dec-2010Cellular automata model for work zone trafficMeng, Q. ; Weng, J.
6Aug-2012Classification and regression tree approach for predicting drivers' merging behavior in short-term work zone merging areasMeng, Q. ; Weng, J.
71-Dec-2011Decision tree-based model for estimation of work zone capacityWeng, J.; Meng, Q. 
8Apr-2012Effects of environment, vehicle and driver characteristics on risky driving behavior at work zonesWeng, J.; Meng, Q. 
912-Jan-2012Ensemble tree approach to estimating work zone capacityWeng, J.; Meng, Q. 
10Oct-2013Estimating capacity and traffic delay in work zones: An overviewWeng, J.; Meng, Q. 
11Jul-2011Evaluation of rear-end crash risk at work zone using work zone traffic dataMeng, Q. ; Weng, J.
122015Incorporating work zone configuration factors into speed-flow and capacity modelsWeng, J.; Meng, Q. 
13Dec-2011Modeling speed-flow relationship and merging behavior in work zone merging areasWeng, J.; Meng, Q. 
14Dec-2011Modeling speed-flow relationship and merging behavior in work zone merging areasWeng, J.; Meng, Q. 
15Apr-2013Optimal subwork zone length and project start time for short-term daytime work zones from the contractor's perspectiveMeng, Q. ; Weng, J.
16Apr-2013Optimal subwork zone length and project start time for short-term daytime work zones from the contractor's perspectiveMeng, Q. ; Weng, J.
17Mar-2013Optimal subwork zone operational strategy for short-term work zone projects in four-lane two-way freewaysMeng, Q. ; Weng, J.
18Mar-2013Optimal subwork zone operational strategy for short-term work zone projects in four-lane two-way freewaysMeng, Q. ; Weng, J.
192014Rear-end crash potential estimation in the work zone merging areasWeng, J.; Meng, Q. 
20Mar-2013Tree-based logistic regression approach for work zone casualty risk assessmentWeng, J.; Meng, Q. ; Wang, D.Z.W.