Full Name
Lu Yujie
(not current staff)
Variants
Lu, Y.
 
Main Affiliation
 
 
Email
bdgluy@nus.edu.sg
 

Results 21-40 of 93 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
212010Complex projects organization networking: Perspectives from centrality, Centralization and powerLi Y.; Lu Y. 
222012Complex projects organization power quantification and empirical study based on SNALi Y.-K.; Le Y.; He Q.-H.; Lu Y.-J. 
3Aug-2011Construction Project Front-end PlanningLe Y.; Li Y.; Xie L.; He Q.; Lu Y. 
42016Corporate sustainability for architecture engineering and construction (AEC) organizations: Framework, transition and implication strategiesLu Y. ; Zhang X.
52014Decomposition of Energy-induced Carbon Emissions in the Construction Industry of ChinaLi D.; Lu Y. ; Zhang B.; Cui P.
62015Decomposition of Life Cycle Energy Consumption of Buildings in ChinaLu Y. ; Cui P.
72011Design of integrated cost and contract management information systems for mega projectLuo S.; Lu Y. ; Le Y.; Peng Y.
82015Developing a city-level multi-project management information system for Chinese urbanizationLi, Y.; Lu, Y. ; Kwak, Y.H.; Dong, S.
92015Developing a risk assessment method for complex pipe jacking construction projectsCheng M.; Lu Y. 
102011Developing cost control information system in the complex projectLuo S.; Lu Y. ; Peng Y.; Le Y.
112016Development of an automated estimator of life-cycle carbon emissions for residential buildings: A case study in Nanjing, ChinaLi D.; Cui P. ; Lu Y. 
122018Development of an innovation diffusion model for renewable energy deploymentZhang, N. ; Lu, Y. ; Chen, J.
132012Effectiveness and equity implications of carbon policies in the United States construction industryLu Y. ; Zhu X.; Cui Q.
142010Efficiency and Equity Implications of Carbon Tax in the Construction IndustryZhu X.; Lu Y. ; Cui Q.
152017Energy conservation through flexible HVAC management in large spaces: An IPS-based demand-driven control (IDC) systemWang W.; Chen J.; Lu Y. ; Wei H.-H.
162017Energy efficient HVAC control for an IPS-enabled large space in commercial buildings through dynamic spatial occupancy distributionWang W.; Chen J.; Huang G.; Lu Y. 
172012Enterprise Resource Planning Systems for Project-Based Firms: Benefits, Costs & Implementation ChallengesZeng Y.; Lu Y. ; Skibniewski M.
182016Environmental impacts of substituting tempered glass with polycarbonate in construction - An attributional and consequential life cycle perspectiveKua H.W. ; Lu Y. 
192015Evaluation and optimization of city infrastructure multi-projects integration control systemZheng X.; Lu Y. ; Li Y.; Le Y.
202016Evolutionary collaboration network and organizational competitiveness in megaprojectsLu Y. ; Pang D.; Li Y.