Full Name
Yang Miang Goh
Variants
Goh, Y.M.
Goh, Yang Miang
 
 
 
Email
bdggym@nus.edu.sg
 

Refined By:
Department:  BUILDING

Results 41-60 of 67 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
412015Investigating the adequacy of horizontal lifeline system design through case studies from SingaporeGoh Y.M. ; Wang Q. 
422016Investigating the effectiveness of fall prevention plan and success factors for program-based safety interventionsGoh Y.M. ; Goh W.M.
432016Knowledge, attitude and practices for design for safety: A study on civil & structural engineersGoh Y.M. ; Chua S.
442017Knowledge, Attitude, and Practice of Design for Safety: Multiple Stakeholders in the Singapore Construction IndustryToh Y.Z.; Goh Y.M. ; Guo B.H.W. 
452015Learning from the Bhopal disaster to improve process safety management in SingaporeGoh Y.M. ; Tan S.; Lai K.C.
46Aug-2012Methodological application of system dynamics for evaluating traffic safety policyGoh, Y.M. ; Love, P.E.D.
472015Modelling and simulation of complex sociotechnical systems: envisioning and analysing work environmentsHettinger L.J.; Kirlik A.; GOH YANG MIANG ; Buckle P.
48May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
49May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
502017Ontology for design of active fall protection systemsGuo B.H.W. ; Goh Y.M. 
512012Organizational accidents: A systemic model of production versus protectionGoh Y.M. ; Love P.E.D.; Brown H.; Spickett J.
522009OSH Monitoring: A Review of Current Research.Goh Y.M. 
532016Overview and Analysis of Ontology Studies Supporting Development of the Construction IndustryZhou Z.; Goh Y.M. ; Shen L. 
542015Overview and analysis of safety management studies in the construction industryZhou Z. ; Goh Y.M. ; Li Q.
551-Mar-2020Perceived Importance of Authentic Learning Factors in Designing Construction Safety Simulation Game-Based Assignment: Random Forest ApproachLee Yoyo Yi Ru; HANA SAMAD ; GOH YANG MIANG 
56Jun-2005Poisson model of construction incident occurrenceChua, D.K.H. ; Goh, Y.M. 
572010Rework in complex offshore projects: The case of oil and gas tension leg platformsLove P.E.D.; Goh Y.M. ; Han S.
5821-Jan-2021Special Issue: What have we learnt from the COVID-19 global pandemic: Improving the construction industry?s abilities to foresee, respond to and recover from future endemic catastrophesPaul Chan; Helen Lingard; Rita Zhang; Christine Raisanen; Yang Miang Goh ; Paul Bowen; Siddharth Bhandari
595-Feb-2021Sustainability analysis of reused industrial buildings in china: An assessment methodTian, Wei; Zhong, Xingju; Zhang, Guangmin; Goh, Yang Miang 
602010System Dynamics Analysis of Organizational Accidents: A Review of Current Approaches.Goh Y.M. ; Love, Peter E. D.; Lo, Daniel