Full Name
Huang Huei Chuen
(not current staff)
Variants
Huang, H.C.
Huang, H.-C.
Huang, Huei Chuen
 
 
 
Email
isehhc@nus.edu.sg
 

Publications

Results 21-40 of 45 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
21Aug-2009Genetic algorithms for the multiple-machine economic lot scheduling problemSun, H.; Huang, H.-C. ; Jaruphongsa, W. 
22Jan-2013Heuristic algorithms for general k-level facility location problemsLi, R.; Huang, H.-C. ; Huang, J.
23Apr-2006Heuristic algorithms for visiting the customers in a rolling schedule environmentTeng, S.Y. ; Ong, H.L. ; Huang, H.C. 
242008Human resource planning with worker attendance uncertaintyNg, T.S. ; Huang, H.C. ; Ng, J.Y.
251-Jan-2007Improved algorithm for a generalized on-line scheduling problem on identical machinesLi, R.; Huang, H.-C. 
26Jan-2010Input-output analysis of CO2 emissions embodied in trade: The effects of sector aggregationSu, B.; Huang, H.C. ; Ang, B.W. ; Zhou, P. 
27Dec-2007List scheduling for jobs with arbitrary release times and similar lengthsLi, R.; Huang, H.-C. 
28May-2002Modeling the vehicle routine problem for a soft drink distribution companyCheong, Y.M.; Ong, H.L. ; Huang, H.C. 
2916-Nov-2010Modified base-stock policies for semiconductor production system with dependent yield ratesHuang, H.-C. ; Song, H.
30Feb-2011On a new rotation tour network model for aircraft maintenance routing problemLiang, Z.; Chaovalitwongse, W.A.; Huang, H.C. ; Johnson, E.L.
311986ON MINIMIZING FLOW TIME ON PROCESSORS WITH VARIABLE UNIT PROCESSING TIME.Huang, H.C. 
322004On-line Scheduling for jobs with arbitrary release timesLi, R. ; Huang, H.-C. 
33Jul-2002Performance measures for returnable inventory: A case studyChew, E.P. ; Huang, H.C. ; Horiana
34Nov-2009Properties and linkages of some index decomposition analysis methodsAng, B.W. ; Huang, H.C. ; Mu, A.R.
352005Reservation storage policy for AS/RS at air cargo terminalsLee, C.; Liu, B.; Huang, H.C. ; Xu, Z.; Goldsman, P.
361-Nov-2006Short-term booking of air cargo spaceChew, E.-P. ; Huang, H.-C. ; Johnson, E.L.; Nemhauser, G.L.; Sokol, J.S.; Leong, C.-H.
37Aug-2009SimMan-A simulation model for workforce capacity planningHuang, H.-C. ; Lee, L.-H. ; Song, H.; Thomas Eck, B.
382007Simultaneous fleet assignment and cargo routing using benders decompositionLi, D.; Huang, H.-C. ; Chew, E.-P. ; Morton, A.D.
39Jul-2006Simultaneous fleet assignment and cargo routing using benders decompositionLi, D.; Huang, H.-C. ; Morton, A.D.; Chew, E.-P. 
402010The economic lot scheduling problem under extended basic period and power-of-two policySun, H.; Huang, H.-C. ; Jaruphongsa, W.