Please use this identifier to cite or link to this item: https://doi.org/10.1061/(ASCE)EI.1943-5541.0000006
Title: Project management and green buildings: Lessons from the rating systems
Authors: Wu, P.
Low, S.P. 
Keywords: Climate change
Construction companies
Project management
Sustainable development
Issue Date: 2010
Citation: Wu, P., Low, S.P. (2010). Project management and green buildings: Lessons from the rating systems. Journal of Professional Issues in Engineering Education and Practice 136 (2) : 64-70. ScholarBank@NUS Repository. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000006
Abstract: Building sector is the largest source of greenhouse gas emissions around the globe. Being green, or sustainable, is one pressing issue coming from both internal and external drivers for construction and engineering companies. Green building has experienced rapid growth in the past several years. To assess how green, or sustainable, the building is, several green rating systems have been developed. Among these rating systems, more similarities exist than differences. One noteworthy difference-project management-serves as the motivation behind this investigation. To identify the role of project management that is less related to technology and engineering in developing green building rating systems, this research centers on a comparison between the LEED, the Green Globes, and the BCA Green Mark to obtain an understanding of current practices, and more importantly, to address the significance of project management in achieving green or sustainable construction. The findings suggest that project management adopted in green building construction involves both the practice and the process. Although the practice-mainly represented through the project management body of knowledge-is currently the focus of green building construction, the importance of the process, such as managing people, organizational structure, building commissioning, performance documentation, and so on, cannot be neglected, as can be seen from the evolution of the green rating systems. It is recommended that the construction and engineering companies take project management in terms of both the process and the practice into consideration when fulfilling requirements of being green. © 2010 ASCE.
Source Title: Journal of Professional Issues in Engineering Education and Practice
URI: http://scholarbank.nus.edu.sg/handle/10635/45805
ISSN: 10523928
DOI: 10.1061/(ASCE)EI.1943-5541.0000006
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.