Title: Just-in-time management in precast concrete construction: A survey of the readiness of main contractors in Singapore
Authors: Pheng, L.S. 
Chuan, C.J.
Keywords: Agile production
Construction industry
Just-in-time
Lean production
Issue Date: 2001
Citation: Pheng, L.S.,Chuan, C.J. (2001). Just-in-time management in precast concrete construction: A survey of the readiness of main contractors in Singapore. Integrated Manufacturing Systems 12 (6-7) : 416-429. ScholarBank@NUS Repository. https://doi.org/10.1108/EUM0000000006107
Abstract: The Just-In-Time (JIT) philosophy holds tremendous potentials for improving the movement of precast concrete components from the prefabrication yard to, and within, the construction site. The space constraints for storage and the traffic congestion at the worksite can then be alleviated. Savings from the efficient management of precast concrete components can be used to offset the higher costs of procurement. By means of a survey, this paper examines if main contractors are ready to adopt the JIT philosophy to receiving and installing precast concrete components on site. Observations from the survey, however, suggest that JIT/lean operations need to work hand in hand with agile operations in the supply chain to cope with schedule fluctuations.
Source Title: Integrated Manufacturing Systems
URI: http://scholarbank.nus.edu.sg/handle/10635/45748
ISSN: 09576061
DOI: 10.1108/EUM0000000006107
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.