Title: A comparison of dispatching rules for executing a resource-constrained project with estimated activity durations
Authors: Yang, K.-K. 
Keywords: Dispatching
Heuristics
Project management
Simulation
Issue Date: 1998
Citation: Yang, K.-K. (1998). A comparison of dispatching rules for executing a resource-constrained project with estimated activity durations. Omega 26 (6) : 729-738. ScholarBank@NUS Repository.
Abstract: This research examines the performance of 13 dispatching rules for executing a resource-constrained project whose estimated activity durations may differ from the actual activity durations. The dispatching rules are tested in environments characterized by three factors, namely, the order strength of the precedence relationship, the level of resource availability and the level of estimation errors in the activity durations. The results show that project environment affects only the performance differences but not the grouping of the better dispatching rules. The greatest number of successors, rank positional weight, greatest cumulative resource requirement and minimum activity slack dispatching rules consistently perform better than the other dispatching rules, unaffected by the accuracy of the estimated activity durations. This finding validates the results of many past studies in the deterministic project environment for choosing the right dispatching rule for both projects with and without well-estimated activity durations.
Source Title: Omega
URI: http://scholarbank.nus.edu.sg/handle/10635/44929
ISSN: 03050483
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.