Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/41074
Title: Context-sensitive timing analysis of Esterel programs
Authors: Ju, L. 
Huynh, B.K. 
Chakraborty, S.
Roychoudhury, A. 
Keywords: Esterel
Synchronous programming
Worst-case Execution Time (WCET) analysis
Issue Date: 2009
Citation: Ju, L.,Huynh, B.K.,Chakraborty, S.,Roychoudhury, A. (2009). Context-sensitive timing analysis of Esterel programs. Proceedings - Design Automation Conference : 870-873. ScholarBank@NUS Repository.
Abstract: Traditionally, synchronous languages, such as Esterel, have been compiled into hardware, where timing analysis is relatively easy. When compiled into software - e.g., into sequential C code - very conservative estimation techniques have been used, where the focus has only been on obtaining safe timing estimates and not on the cost of the implementation. While this was acceptable in avionics, efficient implementations and hence tight timing estimates are needed in more cost-sensitive application domains. Lately, a number of advances in Worst-Case Execution Time (WCET) analysis techniques, coupled with the growing use of software in domains such as automotives, have led to a considerable interest in timing analysis of code generated from Esterel specifications. In this paper we propose techniques to obtain tight estimates on the processing time of input events by sequential C code generated from Esterel programs. Execution of an Esterel program - as in all other synchronous languages - is logically made up of a sequence of clock ticks. In reality, they take non-zero time which depends on the generated C code as well as the underlying hardware platform on which this code is executed. Apart from exploiting the specific structure of this C code to obtain tight WCET estimates, we capture program-level contexts across ticks in order to obtain tight estimates on response times of events whose processing spans across multiple clock ticks. Such tighter estimates immediately translate into more cost-effective implementations. Our experimental results with realistic case studies show 30% reduction in timing estimates when program level context information is taken into account. Copyright 2009 ACM.
Source Title: Proceedings - Design Automation Conference
URI: http://scholarbank.nus.edu.sg/handle/10635/41074
ISBN: 9781605584973
ISSN: 0738100X
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.